Langbahn Team – Weltmeisterschaft

Xitucheng station

Xitucheng

西土城
Beijing Subway
Line 10 platform

Changping line platform
General information
LocationZhichun Road / Beitucheng West Road (北土城西路) and Xueyuan Road / Xitucheng Road
Haidian District, Beijing
China
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Line 10
     Changping line
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
OpenedJuly 19, 2008; 16 years ago (2008-07-19) (Line 10)
February 4, 2023; 22 months ago (2023-02-04) (Changping line)[1]
Services
Preceding station Beijing Subway Following station
Zhichun Lu
outer loop / anticlockwise
Line 10 Mudanyuan
inner loop / clockwise
Xueyuanqiao Changping line Jimenqiao
towards Xitucheng
Location
Xitucheng is located in Beijing
Xitucheng
Xitucheng
Location in central Beijing

Xitucheng station (Chinese: 西土城站; pinyin: Xītǔchéng zhàn) is an interchange station on Line 10 and Changping line of the Beijing Subway.

History

From September 19, 2021 to January 8, 2022, the station for Line 10 was renovated in preparation for interchange with the southern extension of the Changping line. Additionally, new stairs and escalators where added and station concourses were expanded.[2] It reopened on January 9, 2022.[3]

The station for Changping line opened on February 4, 2023.[1]

Station layout

The station underground island platforms for both Line 10 and Changping line.

Exits

There are 6 exits, lettered A, B, C, D, E and F. Exits B, C and E are accessible via elevators.

Station art

The Changping line station has 3 murals. The station hall has a mural named 'Tucheng Seal', the lintel wall of the escalator from the station hall to the north and south sides of the platform has a mural named 'Treading Flowers and Going Back', and the ceiling of the transfer passage is decorated with a mural named 'Sky Reverie'.[4]

References

39°58′36″N 116°21′15″E / 39.976549°N 116.354098°E / 39.976549; 116.354098