Wells Dam
Wells Dam | |
---|---|
Location | Chelan / Douglas counties, Washington |
Coordinates | 47°56′43.44″N 119°51′57.6″W / 47.9454000°N 119.866000°W |
Opening date | August 22, 1967 |
Operator(s) | Douglas County Public Utility District |
Dam and spillways | |
Impounds | Columbia River |
Reservoir | |
Creates | Lake Pateros |
Total capacity | 331,200 acre⋅ft (0.4085 km3) |
Power Station | |
Turbines | 10 [1] |
Installed capacity | 840 MW [1] |
Wells Dam is a hydroelectric embankment dam located on the Columbia River, downstream from the confluence of the Okanogan River, Methow River, and the Columbia River in Washington state. The dam, associated structures, and machinery make up the Wells Hydroelectric Project. It is owned and operated by Douglas County Public Utility District.
It has produced electricity since August 22, 1967. Its operating license from the US Federal Energy Regulatory Commission is next up for renewal in 2052.[2] The Wells project has ten generating units rated at a combined 840 megawatts.[3] In addition to the Douglas County and Okanogan County public utility districts, the project provides electricity to Puget Sound Energy, Portland General Electric, PacifiCorp, Avista Corporation,[4] and the Confederated Tribes of the Colville Reservation.[5]
Its reservoir is named Lake Pateros. Just below and adjacent is Carpenter Island boat launch and fish hatchery river access. Lake Pateros is not deep but a high volume of water moves through it. Thus, low-head, high-volume Kaplan turbine runners drive generation.[6]
See also
References
- ^ a b "Preliminary Monthly Electric Generator Inventory". U.S. Energy Information Administration. Retrieved April 17, 2021.
- ^ Christine Pratt (May 30, 2013). "Wells Dam gets new 40-year license". The Wenatchee World. Retrieved May 31, 2018.
- ^ "Douglas County PUD Wells Dam". douglaspud.org. Retrieved September 9, 2021.
- ^ "Wells Hydroelectric Project". Foundation for Water & Energy Education. Retrieved December 18, 2021.
- ^ "How the Confederated Tribes of the Colville Reservation Balance Hydropower and Natural Resource Protection". Hydro Leader. December 14, 2021. Retrieved December 18, 2021.
- ^ "Wells Dam Rehabilitation Project". Toshiba America Energy Systems Corp. Retrieved May 31, 2018.