Vibrant Express
Vibrant Express 港鐵動感號 | |
---|---|
Manufacturer | CSR Qingdao Sifang |
Designer | MBD Design[1] |
Order no. | 840, C6014-14E |
Built at | Qingdao, Shandong, China[2] |
Family name | CRH380A |
Constructed | 2013–2017 |
Entered service | 23 September 2018 |
Number built | 9 sets (72 carriages) |
Formation | 8-car sets ZY–ZE–ZE–ZE–ZE–ZE–ZE–ZY |
Fleet numbers | 0251-0259 |
Capacity | 581 (2 wheelchairs, 68 first class, 511 second class)[3] |
Operators | MTR |
Depots | Shek Kong Stabling Sidings[2] |
Lines served | Guangzhou–Shenzhen–Hong Kong XRL |
Specifications | |
Car body construction |
|
Train length | 203 m (666 ft 0.1 in) |
Car length |
|
Width | 3.38 m (11 ft 1.1 in) |
Height | 3.7 m (12 ft 1.7 in) |
Floor height | 1.3 m (4 ft 3.2 in) |
Platform height | 1.25 m (4 ft 1.2 in) |
Entry | Level |
Doors | 2 per side per car |
Wheelbase | 2,500 mm (8 ft 2.4 in) |
Maximum speed | |
Weight | 408 t (401.6 long tons; 449.7 short tons) |
Traction system | Zhuzhou CSR Times Electric TGA10D water-cooled 3-level[7] IGBT–VVVF converter/inverter control |
Traction motors | 24 × CSR Zhuzhou Electric YQ-365 400 kW (536 hp) outer fan-cooled 3-phase AC induction motor |
Power output |
|
Transmission | Twin-Disc (TD) drive |
Acceleration | 0.4 m/s2 (1.3 ft/s2) |
Power supply | AC-DC-AC |
Electric system(s) | 25 kV 50 Hz AC Overhead catenary |
Current collector(s) | DSA 350 pantograph |
UIC classification | 2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′ |
Bogies | CSR Qingdao Sifang bolsterless bogies with air suspension (powered: SWMB-400, trailer: SWTB-400) |
Braking system(s) | Electropneumatic and regenerative |
Safety system(s) | Chinese Train Control System (CTCS) Level 3 |
Coupling system | Tightlock coupling |
Seating | Transverse |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Vibrant Express | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 動感號 | ||||||||||||||
Simplified Chinese | 动感号 | ||||||||||||||
|
Vibrant Express (Chinese: 動感號),[8][9] also known as MTR CRH380A or MTR380A[not verified in body] is a high-speed train operated by Hong Kong government-owned public transport operator MTR. It was manufactured by Chinese state-owned manufacturer CSR Qingdao Sifang (now CRRC Qingdao Sifang) based on the CRH380A Hexie EMUs developed for China Railway. Nine 8-car trainsets were ordered by the Hong Kong government through the MTR Corporation and delivered between 2016 and 2017.[10][11][12][13][14] It is the first high-speed train produced by CRRC not operated by China Railway.
The train runs between West Kowloon station and Guangzhou South station on the Guangzhou–Shenzhen–Hong Kong Express Rail Link.[15][16][17]
Overview
Vibrant Express is based on the CRH380A electric multiple units (EMUs) high-speed trains designed and manufactured by CSR.
In April 2011, MTR announced a selective invitation to tender (Contract 840) for the procurement of rolling stock to operate on the Guangzhou-Shenzhen-Hong Kong Express Rail Link (XRL) based on the requirements of having nine 8-car trainsets and the maximum operational speed of 350 km/h (217 mph).[18] MTR's procurement team, after assessing the tender's qualifications announced in March 2012 that CSR Qingdao Sifang had been awarded with the contract worth HK$1.74 billion.[19][4]
The first train arrived in Hong Kong on 26 September 2016 at River Trade Terminal, Tuen Mun District, where it was then delivered to Shek Kong Stabling Sidings and Emergency Rescue station.[10][20][2]
On 23 September 2018, West Kowloon station and the Hong Kong section of the XRL began commercial operations. MTR-0252 brought the first passengers (including reporters) from West Kowloon station to Shenzhen North station.
Due to the COVID-19 pandemic, the Hong Kong government suspended all high-speed rail services from 30 January 2020.[21][22] The service reopened on 8 January 2023.[23]
Technical features
Two different materials were used for the body of the train cars: aluminium alloy and fibre-reinforced plastics (FRP). Aluminium alloy was chosen for use on most of the body due to its low weight and high strength so safe high-speed performance could be achieved. For the nose cone, FRP was used because of its ability to be molded into complex aerodynamic shapes necessary sustained at the front of the train in high-speed operations and continue to maintain its structural strength. However, the use of these two materials with different coefficients of linear thermal expansion meant the different rates of expansion could lead to paint peeling off the body. This problem was addressed by using two separate gasket rings on the nose cone to separate it into different sections which are painted independently.[4] They can be distinguished from CRH380A trains operated by China Railway which only have 1 gasket ring.
- Further improvement on collision and fire resistance as well as electromagnetic compatibility and other properties.
- Improved low-resistance shape.
- The optimisation of the bogie design and improvement of the interior structure.
- High-strength air tightness: to further enhance the airtight performance, the fully sealed pressurisation of differential pressure control mode is adopted. The rate of pressure change does not exceed 0.2-kilopascal-per-second [kPa/s] (0.029 psi/s).
- Improved bogie.
- Noise control: Using a variety of new noise absorption materials and noise barrier technology, EMU speed of 350 km/h (217 mph) inside noise keep in 67–69 dB level.
- The axle load still maintained at a level of 15 tonnes (16.5 short tons), under vehicle weight gained by enhancing traction power, structural quality and noise reduction level.
- High-efficiency regenerative braking.
- Ergonomic passenger interface.
- Label text (including fleet number and seat class name) on car body is painted with MTR typefaces, including MTR Song (港鐵宋) for Chinese characters (both Traditional and Simplified, of which Simplified Chinese is a first for Hong Kong) and Myriad MM for alphanumeric characters.
Classes
The Vibrant Express uses the same naming convention for travel classes as those used by G-series (High Speed) trains, the fastest train services operated by China Railway.
The trains have two classes of seats, second/standard class and first class.[24] However, unlike the closely related CRH380A trainsets operated by China Railway, the Vibrant Express does not offer higher-end premium and business class seating or have buffet cars. This is because the Vibrant Express are short-haul trains that service only between Guangzhou South and West Kowloon.[24]
Free Wi-Fi is provided to all passengers. Every car has baggage racks located above the seats and multi-standard power sockets. All seats are reclining and include a foldable seat table. Two wheelchair spaces are located on the seventh of the train.[3][25] Foot Rests are available in First Class.
There are 511 second class seats located in the six intermediate carriages of the train. The second class coaches use 3-2 seat configuration with a mixture of orange, grey and red seats. Coat hooks are available on the sides of every row (next to the windows).[3]
68 first class seats are in a 2-2 configuration and are located on the two end cars of the train. The class feature floral patterns in silver grey and rose red on the seats as well as the floor and walls. Each seat is provided with a reading light an on-board audio and TV entertainment system with a headphone jack. TVs are located at the center and ends of the coach. Coat hooks are featured on the side of every row (next to the window) and the back of every aisle seat.[3] In general. first class tickets are 50-60% more expensive than second class tickets.[24]
Formation
Formation Nomenclature
The numbering and classification system of Vibrant Express train cars is based on the one used for CRH380A trains operated by China Railway.
Power Designation
- M: Motor car
- T: Trailer car
- C: Driver cabin
- P: Pantograph car
Coach Types
- ZE: Second/standard class (二等座車, Pinyin: Èr Děng Zuò Chē)
- ZY: First class (一等座車, Pinyin: Yī Děng Zuò Chē)
Set numbers
Set numbers are composed of the rolling stock type followed by the fleet number. They are displayed on the sides of the end cars. All Vibrant Express trains are part of the CRH380A family.
Carriage Number
- First 4 digits: Fleet number (0251-0259)
- 0253XX: Fleet no. 0253
- 5th and 6th digits: Car number (01-07 and 00)
- XXXX05 = Car no. 5
- XXXX00 = Car no. 8
Formation method
Carriage number | 1 | 2 | 3 | 4 | 5 | 6 | 7 () | 8 |
---|---|---|---|---|---|---|---|---|
Set numbers[a] | CRH380A-025x | |||||||
Coach Type | First class | Second/standard class | First class | |||||
Carriage numbers | ZY 025x01 | ZE 025x02 | ZE 025x03 | ZE 025x04 | ZE 025x05 | ZE 025x06 | ZE 025x07 | ZY 025x00 |
Power Configuration | Tc | M | Mp | M | Mp | M | Tc | |
Capacity | 32 | 91 | 86 | 91 | 86 | 91 | 68
(including 2 wheelchairs) |
36 |
Power unit no. | 1 | 2 | 3 |
- ^ The set number is displayed on the sides of the end cars.
Distribution
As of August 2022
Operator | Quantity | Fleet numbers | Depot | Lines served | |
---|---|---|---|---|---|
CRH380A | |||||
MTR Corporation | 9 | 0251-0259 | Shek Kong Stabling Sidings | Guangzhou–Shenzhen–Hong Kong Express Rail Link |
MTR order information
Contract reference No. 840[19][26] | |
---|---|
Information | Up to date |
Title or Scope | Express Rail Link: Rolling Stock |
Anticipated Date of Prequalification Invitation | Completed |
Anticipated Date of Prequalification Submission or Category of Work in Approved List | Completed |
Anticipated Date for Invitation to Tender | Completed |
Anticipated Date of Contract Award | Completed |
Tendering Procedure | Selective |
Covered by WTO GPA (Y/N) | Y |
Estimated Range of Cost / Awarded Value | M5 |
Total Amount | HK$1,744,017,141 |
Gallery
- A Vibrant Express train at Guangzhou South railway station
- Vibrant Express at Hong Kong West Kowloon railway station
- Vibrant Express G6582 at Guangzhou South station
- Exit door of the Vibrant Express
- First Class Coach
- Second Class Coach
- Connecting doors on Vibrant Express
See also
References
- ^ "Train Rapide Express Rail Link" [Express Rail Link Rapid Train] (Press release) (in French). MBD Design. Retrieved 10 August 2022.
- ^ a b c Yuan, Can (27 September 2016). "CRRC sends first batch of trains to Hong Kong for high-speed rail project". People's Daily Online.
- ^ a b c d "Train Facilities". MTR Corporation. Retrieved 10 August 2022.
- ^ a b c Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways. Latest update on issues relating to train of the Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link (PDF) (Report). Transport Subcommittee, Legislative Council of Hong Kong. June 2016. Retrieved 10 August 2022.
- ^ Chung, Stephy. "Controversial high-speed rail station opens in Hong Kong". CNN. Retrieved 11 August 2022.
Due to its relatively short distance, the Hong Kong section of the Express Rail Link has a maximum speed of 200 kilometers per hour (kph), much lower than the top speed of 300 kph China's bullet trains usually hit.
- ^ a b 阮, 文忠. 广深港高速铁路深港跨境隧道之设计与施工管理 [Guangzhou-Shenzhen-Hong Kong High Speed Rail Cross-border Tunnel Design and Construction Management] (PDF) (Report) (in Simplified Chinese). China Hong Kong Railway Institution.
"深圳福田站至深圳河线路全长 11.4km,设计速度目标值 200km/h [...] 香港段全长约 26km,设计速度目标 200km/h
- ^ "Multi-mode PWM method for three-level inverter of high-speed train" (PDF) (in Chinese (China) and English). Retrieved 8 May 2023.
- ^ "High-speed trains named 'Vibrant Express'". The Standard. 23 March 2018. Archived from the original on 9 November 2022. Retrieved 9 November 2022.
- ^ "Hong Kong High Speed Rail Trains to be Named "動感號 Vibrant Express"" (PDF) (Press release). MTR Corporation. 23 March 2018. Archived (PDF) from the original on 9 October 2022.
- ^ a b "CE views XRL train delivered to Hong Kong (with photos/video)". The Government of Hong Kong SAR. 9 July 2017. Archived from the original on 9 November 2022. Retrieved 10 August 2022.
- ^ 中南車拿下港高鐵列車承造合同 [CSR wins contract for the construction of Hong Kong high-speed rail trains]. Asia Times Chinese (in Traditional Chinese). 20 March 2012. Archived from the original on 12 April 2016.
- ^ 香港高鐵列車由中國南車中標 [CSR wins bid for Hong Kong High-speed trains] (in Traditional Chinese). 香港商業電台. 20 March 2012. Archived from the original on 5 April 2020. Retrieved 21 March 2012.
- ^ 中国南车中标香港高铁列车合约 (Press release) (in Simplified Chinese). CSR Corporation. 21 March 2012. Archived from the original on 31 December 2014. Retrieved 10 August 2022.
- ^ 廣深港高鐵2015竣工. 中國南車奪列車合約 (in Chinese (Hong Kong)). Archived from the original on 23 March 2012. Retrieved 20 April 2012.
- ^ "XRL can attract more people: CE". news.gov.hk. 2 October 2018. Retrieved 11 August 2022.
- ^ Sum, Lok-kei; Ng, Naomi; Zhao, Shirley (22 September 2018). "Hong Kong's first high-speed train makes maiden trip across border, as Carrie Lam says rail link will be 'bright light' on China's calling card".
- ^ ""Guangzhou-Shenzhen-Hong Kong" High Speed Rail (Hong Kong Section) Commences Service, Opening a New Chapter for Hong Kong Rail Transport" (PDF) (Press release). MTR Corporation. 23 September 2018. Retrieved 11 August 2022.
- ^ "Re: Follow-up on matters relating to the standard of crashworthiness requirements for trains of the Hong Kong Section of Guangzhou-Shenzhen-Hong Kong Express Rail Link ("XRL")" (PDF). Legislative Council of Hong Kong. 17 November 2014. Retrieved 10 August 2022.
- ^ a b "Notice of award of contract during March 2012". MTR Corporation. Archived from the original on 12 July 2012. Retrieved 10 August 2022.
- ^ "MTR receives first XRL's train". RailwayPRO. 27 September 2016. Retrieved 10 August 2022.
- ^ "Hong Kong to suspend high-speed rail service in bid to halt spread of coronavirus". CNBC. Reuters. 28 January 2020. Retrieved 10 August 2022.
Hong Kong leader Carrie Lam said on Tuesday the high-speed rail service between the city and mainland China would be suspended from Jan. 30.
- ^ "Hong Kong to suspend high-speed rail service in bid to halt spread of coronavirus". Hong Kong: The Straits Times. Reuters.
- ^ "China-Hong Kong high-speed rail link reopens after three years". Railway Technology. 16 January 2023.
- ^ a b c "Fare charts" (PDF). MTR Corporation. 1 August 2022. Retrieved 10 August 2022.
- ^ "Barrier-free Train Trip". MTR High Speed Rail. MTR Corporation.
- ^ "港鐵 > 主頁". Archived from the original on 14 April 2012. Retrieved 20 April 2012.