Langbahn Team – Weltmeisterschaft

Waycross—Montgomery Line

Waycross—Montgomery Line
Overview
Other name(s)Thomasville Subdivision
Dothan Subdivision
StatusStill operating under CSX
OwnerAtlantic Coast Line Railroad (1902–1967)
Seaboard Coast Line Railroad (1967–1986)
CSX Transportation (1986-present)
LocaleGeorgia and Alabama
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationNo
SignallingNone
Route map
Map

The Atlantic Coast Line Railroad's Waycross—Montgomery Line (N Line) was one of the company's secondary main lines running from Waycross, Georgia west to Montgomery, Alabama, a distance of over 300 miles. It was built in the late 1800s by the Atlantic Coast Line's predecessor companies. The line is still in service today and is now the Thomasville Subdivision and Dothan Subdivision of CSX Transportation, the Atlantic Coast Line's successor company through various mergers.[1]

Route Description

Atlantic Coast Line's Thomasville Depot

The Waycross—Montgomery Line began in Waycross, Georgia which was a significant junction and terminal for the Atlantic Coast Line. From Waycross, the line ran from Waycross southwest through rural southern Georgia to Valdosta and then west to Thomasville. Thomasville was also a major junction for the Atlantic Coast Line, with lines heading north to Albany and Fitzgerald and a line heading south to Florida which would later become part of their historic Perry Cutoff along Florida's west coast.[2]

Beyond Thomasville, the Waycross—Montgomery Line continued west to Bainbridge, where it turned northwest and continued across the Chattahoochee River and into Alabama. In Alabama, it largely kept a northwest trajectory and passed through Dothan before reaching its terminus in Montgomery.

Since it spanned such a great distance, the segment from Waycross to Thomasville was within the company's Waycross District and the rest of the line west from Thomasville to Montgomery was within their Montgomery District.[3]

Branches

The Waycross—Montgomery Line also had a few branch lines along its route. The Chattahoochee Branch ran from the line at Climax, Georgia southwest into Florida, where it terminated at River Junction in Chattahoochee.

The Abbeville Branch ran from the line at Grimes, Alabama north to Abbeville, Alabama.

The Elba Branch ran from the line at Waterford (just northeast of Newton) and ran largely west through Enterprise, and New Brockton to Elba.

The Luverne Branch ran from line at Sprague and ran south to Luverne, Alabama, a distance of 33.5 miles (53.9 km).

History

1859-1902: Formation under predecessors

The Waycross—Montgomery Line was built in two parts by two different railroads in the late 1880s. The line from Waycross to Bainbridge, Georgia was first built by the Atlantic and Gulf Railroad. It was completed from Waycross to Thomasville in 1859, shortly before the outbreak of the Civil War in 1861 which interrupted further construction. An extension east to Bainbridge was not completed until 1867.[4] Henry B. Plant acquired the Atlantic and Gulf in November 1879 and reorganized the railroad as the Savannah, Florida and Western Railway (SF&W) the following month.[5] Under Plant's direction, the SF&W then built the Chattahoochee Branch in 1882 from Climax southwest to the Florida state line. Plant then chartered the Chattahoochee and East Pass Railroad (which had been chartered 1881) to continue the branch to the Chattahoochee River at River Junction, a hamlet which later came to be known as Chattahoochee, Florida.

In 1887, the SF&W began building a 36-acre yard in Waycross.[6]

In March 1887 the Alabama Midland Railway was chartered in Alabama and Georgia in October to construct a line connecting Montgomery and Bainbridge. The company was consolidated on October 28, 1888, and completed the entire 175 miles (282 km) between the two cities in 1890. Construction also included the Luverne Branch.[7]

After the completion of the Alabama Midland Railway, it was acquired in July 1890 by Henry B. Plant of the Plant System and merged into the SF&W. Together the railroads formed a continuous mainline from Savannah to Montgomery, colloquially known as the "bow line" due to its distinctive shape.[8]

1902-1967: Atlantic Coast Line ownership

Postcard of the Atlantic Coast Line's Waycross yard and shops

The Atlantic Coast Line gained control of the Plant System on July 1, 1902.[7] The Atlantic Coast Line designated the SF&W from Waycross to Montgomery as its own line with track east of Waycross being incorporated into other routes for the company.[8] The Waycross—Montgomery Line would become a busy route for the Atlantic Coast Line. It became the route of the South Wind, which originated in Chicago and travelled to Montgomery via Louisville and Nashville Railroad, and then ran from Montgomery to Waycross and on to Florida.

By the end of 1949, two local passenger trains (which originated in Savannah, Georgia) were running the line in addition to the South Wind. At the same time, two local freight trains ran the full length of the line, with a third local freight train running six days a week. Three freight trains to Florida also ran the line from Waycross to DuPont, where they diverged on to the DuPont—Lakeland Line.

The Atlantic Coast Line abandoned the Luverne Branch in the 1950s.[3][9]

Later years

The Atlantic Coast Line became the Seaboard Coast Line Railroad (SCL) in 1967 after merging with their rival, the Seaboard Air Line Railroad (SAL). At the time of the merger, the Seaboard Air Line operated a nearly parallel route from Savannah to Montgomery (the former Savannah, Americus and Montgomery Railway) that ran less than 100 miles to the north.[10] Though that route was freight-only by the time of the merger.[11]

The Seaboard Coast Line adopted the Seaboard Air Line's method of naming their lines as subdivisions. As a result, the Waycross—Thomasville Line was renamed by the company to the Thomasville Subdivision east of Thomasville, and the Dothan Subdivision west of there (as it is today). The branch to Chattahoochee became the Chattahoochee Subdivision.[12]

The Seaboard Coast Line continued passenger service on the line including the South Wind until May of 1971, when the Seaboard Coast Line's passenger services were taken over by Amtrak. Amtrak continued to operate the South Wind until November 14, 1971, when Amtrak renamed the train the Floridian and reduced it to a two-night schedule.[13]: 94–96  Passenger service was ended on the line when Amtrak discontinued the Floridian in 1979 as part of the Federal budget cuts that year that impacted several major Amtrak routes.

In 1978, Waycross Yard was renamed Rice Yard in honor of former Atlantic Coast Line Chairman Thomas Rice.[6]

In 1980, the Seaboard Coast Line's parent company merged with the Chessie System, creating the CSX Corporation. The CSX Corporation initially operated the Chessie and Seaboard Systems separately until 1986, when they were merged into CSX Transportation.

The Chattahoochee Subdivision was abandoned in 1983.

Current operations

The full line from Waycross to Montgomery is still in service today and is owned and operated by CSX Transportation. Freight CSX trains still run the full line from Waycross to Montgomery, including lengthy local road freight trains. The line is mostly dispatched by Track Warrant Control.[1]

Thomasville Subdivision

The line from Waycross west to Thomasville is still operating as CSX's Thomasville Subdivision. CSX has made upgrades to the Thomasville Subdivision in recent years, including the installation continuous welded rail in the early 2020s.[8]

The Thomasville Subdivision interchanges with the Georgia and Florida Railway in Valdosta, Quitman, and Thomasville. It also intersects Norfolk Southern Railway's Macon and Navair Districts in Valdosta.[1]

Dothan Subdivision

Dothan Subdivision passing in Whigham, Georgia

The line from Thomasville west to Montgomery is still operating as CSX's Dothan Subdivision.[1]

Numerous unit trains originating or terminating on the Dothan Subdivision continue to operate, including loaded and empty unit grain to and from the feed mills located in Troy, Banks, Pinckard, and Enterprise (via Waterford). In addition to lengthy local road freight trains, occasional unit train shipments of rock and pipe continue to originate in Dothan.

A number of shortlines also interchange with CSX on the Dothan Subdivision, including the Conecuh Valley Railroad at Troy, the Wiregrass Central Railroad near Newton, the Bay Line Railroad at Grimes and Dothan, the Chattahoochee Industrial Railroad at Saffold, Georgia, and the Georgia Southwestern Railroad at Bainbridge. The Bay Line Railroad also has trackage rights from Dothan to Grimes to connect its two lines.[14]

Perhaps the biggest boon to the Dothan Subdivision came in 2005 as Hyundai completed the construction of a new automotive assembly plant near Montgomery. This plant generates significant traffic for the line.[15] The railroad also provides an important relief route for the frequently congested Manchester Subdivision, a purpose the line has also served for CSX's predecessors.[16]

Rice Yard

Rice Yard in Waycross, Georgia is still in service and it has grown to over 850-acres. It is now the largest railroad yard in the southeast and the second largest yard in the CSX system. CSX's largest locomotive maintenance and inspection facility is located within the yard as well. Between 1,700 and 2,900 cars rail cars pass through Rice Yard for classification or inspection a day.[6]

Historic Stations

Montgomery Union Station
Waycross to Montgomery
State Milepost City/Location Station[3][12] Connections and notes
GA AN 587.8 Waycross Waycross originally Malvern
junction with:
AN 590.0 West Waycross
AN 594.2 Ruskin
AN 599.6 Glenmore
AN 601.5 Manor
AN 607.4 Argyle
AN 613.4 Homersville
AN 617.4 Cutting
AN 622.3 DuPont DuPont junction with DuPont—Lakeland Line
originally Lawton
AN 628.9 Stockton
AN 634.8 Naylor junction with Lakeland Railway
AN 640.8 Bandy
AN 649.8 Valdosta Valdosta junction with:
AN 650.9 West Valdosta
AN 655.5 Kinderlou
AN 657.9 Ousley
AN 665.3 Quitman Quitman junction with South Georgia Railroad (SOU)
AN 672.1 Dixie originally Groover
AN 674.6 Pidcock original junction with Georgia Northern Railway (SOU)
AN 679.3 Boston Boston junction with Georgia Northern Railway (SOU)
AN 686.3 Newark
AN 691.5 Thomasville Thomasville rebuilt in 1914
junction with:
AN 698.9 Pine Park
AN 705.6 Cairo junction with Pelham and Havana Railroad
AN 712.6 Whigham
AN 719.0 Climax Climax junction with Chattahoochee Branch
AN 728.9 Bainbridge Bainbridge junction with:
AN 730.1 West Bainbridge
AN 734.1 Hanover
AN 737.6 Brinson Brinson
AN 744.0 Iron City Iron City
AN 748.6 Donalsonville Donalsonville
AN 754.7 Jakin Jakin
AN 759.1 Saffold
AL AN 761.3 Alaga
AN 763.3 Gordon Gordon
AN 769.0 Pansey
AN 772.5 Ashford Ashford
AN 776.9 Cowarts Cowarts
AN 783.3 Dothan Dothan junction with:
AN 789.0 Grimes Grimes junction with Abbeville Branch
AN 792.6 Midland City Midland City
AN 795.9 Pinckard Pinckard
AN 800.5 Newton Waterford junction with Elba Branch
AN 806.1 Ewell
AN 810.3 Ozark Ozark
AN 816.2 Dillard
AN 822.2 Ariton Ariton
AN 826.4 Tennille
AN 833.9 Brundidge Brundidge
AN 840.3 Banks Banks
AN 848.4 Corcoran
AN 851.1 Troy Troy
AN 851.6 West Troy
AN 858.8 Youngblood
AN 865.5 Olustee
AN 871.1 Grady
AN 876.0 Ramer
AN 883.9 Sprague junction with Luverne Branch
AN 889.1 Tharin
AN 894.1 Snowdoun
AN 898.2 Wiley
AN 900.7 Montgomery Day Street Yard
AN 902.2 Montgomery Union Station junction with:
Chattahoochee Branch
State Milepost City/Location Station Connections and notes
GA ANE 719.1 Climax Climax junction with Waycross—Montgomery Line
ANE 721.1 Otisca
ANE 727.7 Fowlstown junction with Georgia Florida and Alabama Railroad (SAL)
ANE 734.4 Faceville
ANE 740.5 Recovery
FL ANE 749.4 Chattahoochee River Junction junction with:
Luverne Branch
Milepost City/Location Station Connections and notes
ANH 883.9 Sprague junction with Waycross—Montgomery Line
ANH 892.5 Sellers
ANH 899.3 Lapine
ANH 904.1 Bradleyton
ANH 908.3 Petrey
ANH 913.2 Patsburg
ANH 919.2 Luverne Luverne

See also

References

  1. ^ a b c d CSX Jacksonville Division Timetable
  2. ^ "Remembering the Atlantic Coast Line Railroad". Trains.com. 28 June 2020. Retrieved 13 June 2023.
  3. ^ a b c Atlantic Coast Line Railroad Southern Division Timetable (1949)
  4. ^ "Atlantic & Gulf Railroad". 10 June 2006. Retrieved 17 September 2010.
  5. ^ "Savannah, Florida & Western Railway". 21 October 2008. Retrieved 17 September 2010.
  6. ^ a b c "Waycross, GA: CSX/Atlantic Coast Line Rice Railyard". Towns and Nature. 27 October 2021. Retrieved 5 June 2023.
  7. ^ a b Owen, Thomas M. (1921). History of Alabama and Dictionary of Alabama Biography. Vol. 1. S.J. Clarke Publishing Company. p. 71.
  8. ^ a b c Harmon, Danny (2 March 2020). "Chasing Reroutes On The Bow Line!". YouTube. Retrieved 8 June 2023.
  9. ^ "Montgomery map (1957)". United States Geological Survey. Retrieved June 12, 2023.
  10. ^ Crowe, Frank (2001). "Pig Trails of Southwest Georgia: Part 1". Lines South. 18 (4). White River Productions: 4–17.
  11. ^ "Discontinuance of Two Trains Okayed". Times Daily. 2 March 1951. Retrieved 9 June 2023.
  12. ^ a b Seaboard Coast Line Railroad Savannah and Waycross Division Timetable (1982)
  13. ^ Goldberg, Bruce (1981). Amtrak--the first decade. Silver Spring, MD: Alan Books. OCLC 7925036.
  14. ^ "Bay Line Railroad (BAYL)". Genesee & Wyoming Railroad. Retrieved 12 June 2023.
  15. ^ "Alabama Rail Plan 2008" (PDF). December 2008. pp. ES-5. Archived from the original (PDF) on 14 August 2011. Retrieved 17 September 2010.
  16. ^ Harwell, Jeffrey (2008). "Operations In and Around Dothan". Lines South. 25 (1). White River Productions: 4–19.