Salto Grande Dam
Salto Grande Dam | |
---|---|
Location | Concordia Salto |
Coordinates | 31°16′29″S 57°56′18″W / 31.27472°S 57.93833°W |
Construction began | April 1, 1974 |
Opening date | 1979 |
Dam and spillways | |
Impounds | Uruguay River |
Height | 65 m (213 ft) |
Length | 3,000 m (9,800 ft) |
Spillway capacity | 64,000 m3/s (2,300,000 cu ft/s) |
Reservoir | |
Creates | Salto Grande Reservoir |
Total capacity | 5 km3 (4,100,000 acre⋅ft) |
Catchment area | 224,000 km2 (86,000 sq mi) |
Surface area | 783 km2 (302 sq mi) |
Power Station | |
Turbines | 14 × 135 MW (181,000 hp) |
Installed capacity | 1,890 MW (2,530,000 hp) |
Annual generation | 7,812 GWh |
Website https://www.saltogrande.org/index.php |
The Salto Grande Dam is a large hydroelectric dam on the Uruguay River, located between Concordia, Argentina, and Salto, Uruguay; thus shared between the two countries.
The construction of the dam began in 1974 and was completed in 1979. Power is generated by fourteen Kaplan turbines, totaling the installed capacity to 1,890 MW (2,530,000 hp). The dam passes approximately 64,000 cubic metres (2,300,000 cu ft) of water per second, compared to the current average flow of the Uruguay River at 4,622 cubic metres (163,200 cu ft). The reservoir has a total area of 783 square kilometres (302 sq mi), while its maximum dimensions are 140 by 9 kilometres (87.0 mi × 5.6 mi).[1][2]
Gallery
- The Salto Grande dam
- Inside the generator hall
- Salto Grande Bridge over the dam
See also
- List of conventional hydroelectric power stations
- List of power stations in Argentina
- Salto Grande Waterfall
- Salto Grande Bridge
References
- ^ Hydroelectric power stations in Argentina, archived from the original on 2012-05-27, retrieved 2010-03-27
- ^ Hydroelectric power stations in Uruguay, archived from the original on 2009-07-18, retrieved 2010-03-27