Moshikou station
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Intersection of Shimen Road (石门路) and Moshikou Street (模式口大街), Jindingjie Subdistrict, Shijingshan District, Beijing China | ||||||||||
Coordinates | 39°55′56″N 116°08′59″E / 39.932339°N 116.149690°E | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 11 | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2023 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Moshikou station[1] (Chinese: 模式口站; pinyin: Móshìkǒu zhàn) is a subway station on Line 11 of the Beijing Subway. It opened on 30 December 2023,[2] and is the northern terminus of the line.
History
The original project name of this station is Jindingjie station. On September 25, 2020, the Beijing Municipal Commission of Planning and Natural Resources announced the 'Notice on the Naming Plan for Stations Along the Western Section of Rail Transit Line 11 Project', with plans to rename Jindingjie station to Moshikou station. On November 18, 2020, the station was officially renamed as Moshikou station.[3][4]
The station was capped on June 2, 2021, before passing project acceptance inspection on November 15 in the same year.[5][6]
Station layout
The station has 2 underground side platforms. Only the western-facing platform is in use. There are 3 exits, lettered A, B and C, all of which lead to Shimen Road. Exit A is accessible.
- Concourse
References
- ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2024-01-02.
- ^ "地铁17号线北段等三条地铁线(段)开通试运营" (in Chinese). Beijing Municipal Commission of Transport. 2023-12-29. Retrieved 2023-12-29.
2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
- ^ "关于轨道交通11号线西段工程沿线车站命名预案的公示书". 2020-09-25. Archived from the original on 2020-09-26. Retrieved 2023-01-13.
- ^ "轨道交通11号线西段工程沿线车站站名命名位置示意图". 2020-09-25. Archived from the original on 2020-09-26. Retrieved 2023-01-13.
- ^ "冬奥支线四座车站今天结构封顶 预计今年年底实现通车". 北京晚报. 2021-06-02. Archived from the original on 2021-06-03. Retrieved 2023-01-13.
- ^ "地铁11号线01标模式口车站工程通过验收". 2021-11-17. Archived from the original on 2022-03-07. Retrieved 2023-01-13.