Lublin-class minelayer-landing ship
Class overview | |
---|---|
Name | Lublin class |
Builders | Northern Shipyard, Gdańsk |
Operators | Polish Navy |
Preceded by | Północny class |
In commission | 1989–present |
Planned | 12 |
Completed | 5 |
Cancelled | 7 |
Active | 5 |
General characteristics | |
Type | Minelayer-landing ship |
Displacement | 1,745 tonnes |
Length | 95.8 m (314 ft 4 in) |
Beam | 10.8 m (35 ft 5 in) |
Draft | 2.38 m (7 ft 10 in) |
Propulsion | 3x Cegielski-Sulzer 6ATL25D 1,320 kW (1,770 hp) each |
Speed | 16.5 knots (30.6 km/h; 19.0 mph) |
Range | 850 nmi (1,570 km; 980 mi) |
Troops | 135 |
Complement | 37 |
Armament |
|
The Lublin class or Projekt 767 are minelayer-landing ships designed and built in Poland for the Polish Navy, in service since 1989. Only five out of the twelve planned ships were built, by the Northern Shipyard in Gdańsk, due to the fall of Communism. They can carry up to 9 T-72 tanks or 17 transport vehicles such as the Star 266 and 135 equipped troops. They were designed to carry up to 134 naval mines. The ships are named after the chief cities of the Piast dynasty.
On 12 October 2007, ORP Lublin became an honorary citizen of Lublin.
Background
ORP Gryf was a Polish mine-laying vessel and, likely, the only heavy mine-laying vessel built.
List of ships
Pennant number |
Name | Commissioned | Status |
---|---|---|---|
821 | ORP Lublin | 12 October 1989 | In service |
822 | ORP Gniezno | 23 February 1990 | In service |
823 | ORP Kraków | 27 June 1990 | In service |
824 | ORP Poznań | 8 March 1991 | In service |
825 | ORP Toruń | 24 May 1991 | In service |
Gallery
- ORP Kraków
- ORP Poznań
- ORP Gniezno
- ORP Gniezno
References
- "Okręty transportowo-minowe projektu 767, typu Lublin." (in Polish). Polish Navy. Archived from the original on 11 November 2018. Retrieved 7 August 2011.