Langbahn Team – Weltmeisterschaft

Gamuda Berhad

Gamuda Berhad
Company typePublic limited company
MYX: 5398
ISINMYL5398OO002
IndustryEngineering & construction
Infrastructure & concession
Property Development
Founded6 October 1976
FoundersKoon Yew Yin
Lin Yun Ling[1]
HeadquartersMenara Gamuda, D-16-01, Block D, PJ Trade Centre, No. 8, Jalan PJU 8/8A, Bandar Damansara Perdana, 47820 Petaling Jaya, Selangor, Malaysia
Key people
Ambrin Buang, Chairman
Lin Yun Ling, Group managing director & CEO
ProductsMRTs, railways, stormwater management and road tunnel, highways, expressways, bridges, dams, water treatment plant, airports and properties
RevenueIncrease MYR7.181 Billion (2019)
Increase MYR706 Million (2019)
Total assetsIncrease MYR17.191 Billion (2019)
Total equityIncrease MYR8.471 Billion (2019)
Number of employees
≥3,500
SubsidiariesMMC Gamuda
Gamuda Land Sdn Bhd
Yayasan Gamuda
Gamuda Naim Engineering & Construction (GNEC) Sdn Bhd
Naim Gamuda (NAGA) JV Sdn Bhd
WebsiteGamuda Berhad

Gamuda Berhad (MYX: 5398) is an engineering, property and infrastructure company based in Malaysia. It is one of the largest Malaysian infrastructure companies and has undertaken various projects, both locally and overseas, like the construction of Klang Valley MRT lines, highways, airport runways, railways, tunnels, water treatment plants, dams, infrastructure concessions and the development of new townships.

History

The company was incorporated as a private limited company on 6 October 1976 in Ipoh, Perak [2] and was listed on the main a board of Bursa Malaysia on 10 August 1992. It was founded by Koon Yew Yin and Lin Yun Ling.

One of its major projects was the Stormwater Management and Road Tunnel (SMART Tunnel) project – a 50:50 joint venture collaboration with MMC Corporation Berhad. Completed in year 2007, this 9.7 km SMART tunnel primary function is to divert excess floodwater from Sungai Klang and Sungai Ampang to be stored in the storage pond. This dual-purpose tunnel also serves as an alternative route for the motorist to travel to and from the city centre.

In 2008, MMC-Gamuda was awarded the RM12.485 billion worth of Electrified Double Track Project (EDTP) from Ipoh to Padang Besar. This 329 km Project involves the realignment and construction of the electrified double railways that span across four northern states of Perak, Penang, Kedah and Perlis in Peninsular Malaysia.[3] Works are progressing well at 97% overall completion stage and upon completion in November 2014, EDTP will serve as the backbone for the future commuters services in northern area which enable the residents to travel between urban and sub-urban area.[4]

As the Government of Malaysia is transforming Malaysia to become a fully developed nation by year 2020, the railway is playing a pivotal role in the emergence of the public transportation system. Travelling through rail is one of the most efficient travelling methods in avoiding traffic and reduces fuel consumption. Hence, the Klang Valley Mass Rapid Transit (KVMRT) is made as an Entry Point Project of the Economic Transformation Programme (ETP) under the Greater Kuala Lumpur / Klang Valley National Key Economic Area (NKEA).

In January 2011, MMC-Gamuda received the letter of award that they were appointed as the Project Delivery Partner (PDP) for the KVMRT (Sungai Buloh – Kajang Line) (KVMRT, SBK Line). Being the PDP, MMC-Gamuda's role is to deliver the project within the target cost and completion dates, managing the elevated works package contractors, as well as dividing elevated works packages, evaluating tenders, recommending the best elevated works package contractors to MRT Corporation, the owner of the KVMRT project.

Besides, in March 2012, MMC Gamuda (T) Sdn Bhd was appointed as the turnkey contractor for the 9.5 km underground works for KVMRT, SBK Line worth RM8.28 billion. Seven underground stations will be constructed along the 9.5 km tunnel – KL Sentral, Pasar Seni, Merdeka, Bukit Bintang, Pasar Rakyat, Cochrane and Maluri. This underground works package inclusive of the design, construction and completion of tunnels, stations and associated structures between the Semantan Portal and Maluri Portal.

A total of 10 Tunnel Boring Machines (TBMs) have been purchased for the KVMRT, SBK Line tunnelling works. Out of the 10 TBMs, six of them are Variable Density TBMs (VD TBMs) which was co-designed and co-developed by MMC Gamuda in partnership with Herrenknecht AG, the world's largest tunnel boring manufacturer. The VD TBMs are specially designed to tunnel through the Kuala Lumpur's extreme karstic limestone geology. In contrast, the remaining four Earth Pressure Balance TBMs (EPB TBMs) are used to bore through the Kenny Hill formation. The built-in technology in the TBMs prevents the loosening and collapse of the tunnel face during boring, and minimises surface settlement above the tunnels which avoid land subsidence (a major cause of sinkholes). Besides, the TBMs are also designed to reduce water drawdown, which is a major contributory factor in sinkholes developing.

Overall the works for both elevated and underground sections of the SBK Line are advancing fast with progress on-track, and the project is expected to complete by the year 2017.

Besides the local projects they are developing, Gamuda has ventured internationally with various civil engineering construction, infrastructure and property development located in Taiwan, South East and Far East Asia, Indochina, Middle East, Australia, Singapore and Vietnam.

On 28 July 2016, Gamuda announces that it had team up with Sarawak-based Naim Holdings Berhad via an associate company, Naim Gamuda (NAGA) JV Sdn Bhd. Their role is main contractor for Pantu Junction - Batang Skrang section in Sarawak in Pan Borneo Highway project in works package contract (WPC04 PJS). Its length is 89.43 km (55.57 mi).[5][6]

On 1 July 2020 it was announced that Gamuda Bhd would be the project delivery partner (PDP) for the Penang Transport Master Plan (PTMP).[7]

In June 2023, the Australian transport projects division of Downer Group was purchased and renamed DT Infrastructure.[8][9][10]

Infrastructure projects

Airports

Bridge

Expressway Network

Mass Rapid Transit

Railway

  • Electrified Double Track Project (EDTP)(Ipoh-Padang Besar), Malaysia

Township Development (Gamuda Land)

  • Kota Kemuning, Shah Alam – A township
  • Bandar Botanic, Klang
  • Valencia, Sungai Buloh
  • Horizon Hills, Johor – Located within the Iskandar Development Region
  • Jade Hills, Kajang
  • Gamuda Gardens, Rawang
  • Gamuda Cove, Kuala Langat
  • Gamuda Kemuning Twenty-five.7, Kuala Langat
  • Madge Mansion, Kuala Lumpur
  • The Robertson, Kuala Lumpur
  • Kelana Jaya Development, Petaling Jaya
  • Bukit Bantayan Residences, Kota Kinabalu, Sabah
  • 661 Chapel ST, Melbourne
  • Gamuda City, Vietnam
  • Celadon City, Vietnam

Water Treatment and Supply and Sewage Treatment

  • Sungai Selangor Water Supply Scheme Phase 1 (SSP1), Malaysia
  • Sungai Selangor Water Supply Scheme Phase 3 (SSP3), Malaysia
  • Yen So Sewage Treatment Plant, Vietnam

References

  1. ^ #45 Lin Yun Ling Archived 7 March 2023 at the Wayback Machine, Forbes, 27 February 2013.
  2. ^ "Milestones". Archived from the original on 13 June 2023. Retrieved 30 March 2022.
  3. ^ "Group History". Archived from the original on 12 February 2014. Retrieved 24 March 2014.
  4. ^ "Gamuda Berhad Annual Report 2013". Archived from the original on 7 March 2023. Retrieved 24 March 2014.
  5. ^ "Naim-Gamuda JV bags RM1.57b Pan Borneo Highway package". The Edge Markets. 28 July 2016. Archived from the original on 7 March 2023. Retrieved 28 July 2016.
  6. ^ "Naim in tie-up with Gamuda". The Star. 14 November 2018. Archived from the original on 3 December 2020. Retrieved 14 November 2018.
  7. ^ "Gamuda made PDP for Penang Transport Master Plan". The Edge Markets. 1 July 2020. Archived from the original on 24 March 2023. Retrieved 2 July 2020.
  8. ^ EY tows Malaysia’s Gamuda into Downer projects arm Archived 25 May 2024 at the Wayback Machine Australian Financial Review 23 February 2023
  9. ^ Downer completes sale of Australian Transport Projects business Archived 25 May 2024 at the Wayback Machine Downer Group 20 June 2023
  10. ^ History of DT Infrastructure Archived 25 May 2024 at the Wayback Machine DT Infrastructure