This bridge goes over the railway track and road at Holyhead.
The Celtic Gateway is a major transport and regeneration project which has resulted in a dramatic new landmark bridge linking the town centre,railway station,and ferry terminal.
Holyhead is the busiest passenger ferry terminal on the west side of Britain - about 2.3 million people pass through the port each year.The new link makes it far easier for passengers to visit the town.
The 190 meter steel and concrete footway is supported by 18 steel cables from two large arches 1 meter diameter stainless steel tubing.
to share – to copy, distribute and transmit the work
to remix – to adapt the work
Under the following conditions:
attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.