Cost database

A cost database is a computerized database of cost estimating information, which is normally used with construction estimating software to support the formation of cost estimates. A cost database may also simply be an electronic reference of cost data.

Overview

A cost database includes the electronic equivalent of a cost book, or cost reference book, a tool used by estimators for many years. Cost books may be internal records at a particular company or agency,[1] or they may be commercially published books on the open market. AEC teams and federal agencies can and often do collect internally sourced data from their own specialists, vendors, and partners. This is valuable personalized cost data that is captured but often doesn't cover the same range that commercial cost book data can. Internally sourced data is difficult to maintain and do not have the same level of developed user interface or functionalities as a commercial product.

The cost database may be stored in relational database management system, which may be in either an open or proprietary format, serving the data to the cost estimating software. The cost database may be hosted in the cloud. Estimators use a cost database to store data in structured way which is easy to manage and retrieve.[2]

Details

Costing data

The most basic element of a cost estimate and therefore the cost database is the estimate line item or work item.[3] An example is "Concrete, 4000 psi (30 MPa)," which is the description of the item. In the cost database, an item is a row or record in a table (of items) and the description is a column or field for that record. Concrete may also be considered to be a material resource. In some systems, estimate line items and resources are the same, in other systems, various resources may be included with a line item. Other examples of resources are labor resources, such as carpenters, and equipment resources, such as cranes. Labor and equipment resources can be combined into a crew, which is then the assumed crew which will install the item or perform the work. Resources and crews can be stored as data in the cost database and can also be related to work items.

Examples of cost database line items:

Identifier Description Unit of Measure Crew Production Rate Material Price
1 Concrete, 4000 psi (30 mpa) cy CP-01 3.00 cy/hr 112.00
4023 Water closet, wall hung ea PB 2.50 hr/ea 620.00
6119 Motor starter, magnetic, FVNR, 10 hp size 1 ea EL 3.50 hr/ea 262.00

Examples of cost database labor resources:

Identifier Description Unit of Measure Base Price Benefits Insurances Payroll Taxes
CA Carpenter hour 37.32 12.95 5.01 4.56
CM Cement Mason hour 32.51 8.23 2.11 3.90
LA Laborer hour 26.46 5.16 5.72 3.89

Examples of cost database equipment resources:

Identifier Description Unit of Measure Base Price Fuel Filters, Oil, Grease
cv1 Concrete vibrator hour 0.72 0.21 0.02
ex2 Excavator, track-mounted, 1-1/2 cy (1.1 m3) hour 42.00 48.25 6.12
cr100 Crane, track-mounted, lattice boom, 100 ton (90 t) hour 82.50 59.16 8.27

Examples of cost database crews:

Identifier Description Unit of Measure Resource 1 Quantity 1 Resource 2 Quantity 2 Resource 3 Quantity 3
CP-01 Concrete placement hour CA 1 LA 3 cv1 1
EX-01 General excavation hour OP 1 LA 2 ex2 1

Factor and adjustment data

Various factors and adjustments may be useful in the estimating process. Some examples include:

  • Factors to adjust costs from one location to another
  • Factors to adjust costs from one time to another
  • Currency conversion factors
  • Sales and use tax rates
  • Other tax, insurance, and bond rates
  • Overhead factors

Organizational data

Data which may be used to organize a cost estimate into groups and levels, and to summarize the cost details can also be part of a cost database. A popular coding system which can be applied to construction cost estimates is MasterFormat.[4] Another coding method is Uniformat.[5] Also, various types of work breakdown structures or WBS may be used. It may also be useful to assign the costs to a chart of accounts or COA (a.k.a. Code of Accounts). Other organizational needs include:

  • Grouping by job cost account
  • Grouping by subcontractor or vendor
  • Grouping by material class or type
  • Grouping by facility, floor, level, location, area, etc.
  • Grouping by system
  • Grouping by project phase or stage
  • Grouping by inside or outside battery limits

All of these represent organizational data which can be stored in the cost database and used to support the cost estimate.

Calculational data

Data which can be used to calculate quantities and costs can also be part of a cost database. For example, there are various formulas for calculating the area of shapes, the volume of solids or spaces, and the weight of materials. There are defined unit properties of materials also. Materials each have certain densities or unit weights. Reinforcing bars are produced in certain sizes, with certain unit weights. Additionally, data which helps calculate the selection or specification of estimate contents can be included.

See also

References

  1. ^ J. David Nardon, Bridge and Structure Estimating, McGraw-Hill Book Company, 1995, Page 5
  2. ^ "A Visual Approach to Construction Cost Estimating", Phuwadol Samphaongoen, Marquette University, e-Publications@Marquette, Page 47
  3. ^ "A Visual Approach to Construction Cost Estimating", Phuwadol Samphaongoen, e-Publications@Marquette, Page 7
  4. ^ MasterFormat Numbers & Titles, April 2012, The Construction Specifications Institute and Construction Specifications Canada
  5. ^ "Uniformat," Construction Specifications Institute, http://www.csinet.org/uniformat