Langbahn Team – Weltmeisterschaft
Wikipedia editor
Hello!
«※¦Purin128AL¦※»
Talk
Contributions
User logs
Email
Sandbox
CentralAuth
Pages I've created
Pages I've done significant work on
Some files I've created
VCE exam paper front page mockup
Standard deviation diagram for VCE study scores
A manually controlled Fire Danger Rating Sign since the 2022 new system
An electronically controlled Fire Danger Rating Sign since 2022 new system
The proceed train signal for railways equipped with CBTC systems in Melbourne, used on the Cranbourne and Pakenham lines
Australian road signs
Drive on left in Australia road sign (SVG version)
Speed & Red Light Cameras operate throughout Victoria sign
Speed Cameras used in construction zones sign (Victoria)
Road Safety cameras operate in this area sign (Victoria)
Community gateway speed limit sign (Victoria)
Tram lane ahead sign
Part-time tram lane sign
Give way to merging tram sign
Merge left with times sign
Tram only sign
Tram lane sign
Buses, taxis, VHA/B/C excepted sign
Trams excepted sign
Start tollway sign
Tollway enterance sign
End tollway sign
Start Motorway
Motorway Entrance
End Motorway
Coronavirus Quarantine
Coronavirus Quarantine
Community Closed Ahead
Essential Travel Only
Coronavirus Quarantine Border Control Point Ahead
Border Closed 1 km Ahead
Border Control Point
Coronavirus Quarantine Border Control Point Stop Where Directed
Border Closed Ahead
Cassowary
Transit lane
Transit lane end
BSicons
Some route maps I created
North Melbourne railway station track layout |
|
|
|
|
Roxburgh Park railway station |
|
Track layout |
|
|
|
To do list
Create track layout diagram for all Melbourne train stations:
- Belgrave line Y (Completed 27 September 2021)
- Glen Waverley line Y (Completed 28 September 2021)
- Alamein line Y (Completed 28 September 2021)
- Richmond station Y (Completed 28 September 2021)
- Sandringham line Y (Completed 29 September 2021)
- Pakenham line Y (Completed 29 September 2021)
- Update Dandenong after LX removal
- Update Pakenham, East Pakenham after LX removal & extension
- Cranbourne line Y (Completed 30 September 2021)
- Update Cranbourne after LX removal
- Frankston line Y (Completed 30 September 2021)
- Update Glen Huntly after LX removal
- Stony Point line Y (Completed 30 September 2021)
- Metro Tunnel Y (Completed 30 September 2021)
- City Loop Y (Completed 18 October 2021)
- Lilydale line Y (Completed 30 March 2022)
- Update Union station after opening Y
- Flinders Street station Y (Completed 28 May 2022)
- Mernda line Y (Completed 9 March 2023)
- Hurstbridge line Y (Completed 21 May 2023)
- Sunbury line Y (Completed 27 May 2023)
- Update South Kensington and West Footscray after Metro Tunnel opening
- Williamstown line Y (Completed 27 May 2023)
- Werribee line Y (Completed 28 May 2023)
- Flemington Racecourse line Y (Completed 18 June 2023)
- Craigieburn line Y (Completed 19 June 2023)
- Upfield line Y (Completed 20 June 2023)
- North Melbourne station Y (Completed 24 June 2023)
- Southern Cross station -
Create track layout for the V/Line network:
- Geelong line N
- Ballarat line N
- Bendigo line N
- Gippsland line N
- Seymour line N
User boxes
----
VCE | This user has completed the VCE and obtained an ATAR of 97+ |
| This user has been on Wikipedia for 8 years, 9 months and 30 days. |
| This user sings Tenor in a choir. |
| This user is interested in Physics. |
| This user tries to do the right thing. If they make a mistake, please let them know. |
|
WikiProjects