Langbahn Team – Weltmeisterschaft

U of M Transitway

U of M Transitway
A U of M Campus Connector bus near the Transitway's western terminus
Overview
LocaleMinneapolis–Saint Paul, Minnesota
Termini
  • U of M East Bank Campus
  • U of M St. Paul Campus
Connecting linesMETRO Green Line
Stations2
Service
TypeBus rapid transit
SystemUniversity of Minnesota Campus Shuttle
Services
Operator(s)University of Minnesota
History
Opened1992
Technical
Line length2.6 mi (4.2 km)
CharacterAt-grade
Operating speed40 mph (64 km/h)
Route map

5th Street
Buses continued
on surface streets
Oak Street
21st Avenue
23rd Avenue
Buses continue
on surface streets
23rd Avenue
25th Avenue
29th Avenue
30th Avenue
Malcolm Avenue
Originally planned stop
Westgate Drive
Energy Park Drive
Raymond Avenue
Como Avenue
Commonwealth Avenue
Buses continue
on surface streets

The U of M Transitway is a busway operated by the University of Minnesota between its Minneapolis and St. Paul campuses. The Transitway is primarily used by the #121 Campus Connector route of the U of M Campus Shuttle, with additional seasonal services for the Minnesota State Fair and Minnesota Golden Gophers athletic events. The Transitway opened in 1992 as part of a project to ease parking demand on the Minneapolis campus.

The Transitway is 2.6 mi (4.2 km) long, with no intermediate stations. Its intersections are equipped with signal priority, and buses often run nonstop along the entire line. Bicyclists and emergency vehicles are also permitted in the Transitway, and a shared-use path runs parallel to the western half of the line.

Route and services

The Transitway runs between the University of Minnesota's East Bank and St. Paul campuses, running parallel to rail lines at some points. Stations are located at either end of the Transitway, and regular service continues past the Transitway in both directions.[1] The Transitway has no intermediate stations, and buses travel at speeds of up to 40 mph (64 km/h).[2] The Transitway is partially grade-separated, with 3 dedicated bridges and 7 at-grade intersections.

The primary service on the Transitway is the #121 Campus Connector route of the University of Minnesota Campus Shuttle. The Campus Connector operates year-round between the university's West Bank campus and the St. Paul Student Center, via the Transitway and Washington Ave SE.[3]

State Fair shuttle buses and a bicyclist on the Transitway in 2011

The Transitway's eastern terminus is adjacent to the Minnesota State Fairgrounds, and it sees heavy use by shuttle buses during the annual State Fair. The Transitway is a major component of the State Fair's large park-and-ride shuttle operation, which transported over 1.8 million passengers in 12 days for the 2023 fair season.[4] Metro Transit, SouthWest Transit and the Minnesota Valley Transit Authority operate express services to park-and-ride lots in the suburbs, and the State Fair contracts private operators to provide service to lots close to the fairgrounds. The Transitway is also open to charter buses during the State Fair.[5]

History

Plans for a system of park-and-ride lots on the Saint Paul and Minneapolis campuses were first introduced in 1976. The project was delayed due to St. Anthony Park neighborhood concerns, required land purchases, University budgets and federal transportation requirements.[6] U.S. Representative Martin Olav Sabo pushed through $2.8 million for the transitway in the 1987 House appropriations bill.[7][8] The final project was approved in 1990 and included three park and ride lots, two in Minneapolis and one in Saint Paul. The project added 2,400 parking spaces to the Minneapolis campus, at a total cost of $21 million, equivalent to $48 million in 2023.[9] $1.2 million in funding was provided by MnDOT, with $6.4 million from the University and $13.5 million in federal money from the Interstate Substitution Funds.[6][10] The busway opened in 1992.

The western end of the transitway was cut back about 14 mile (0.40 km) in 2008 in order to make way for the new TCF Bank Stadium. Previously, it had run all the way to Oak Street in front of Mariucci Arena. This process also removed two stops on the western end of the transitway where there had previously been parking lots. Northbound Campus Connectors loop north around the stadium on 6th Street and Oak Street, while southbound buses use Oak Street to University Avenue before turning right onto 26th Avenue. The western stops were eliminated, while the eastern stops were moved to the entrance of the transitway. Stops at the eastern end of the transitway at Commonwealth Avenue were not affected.

Safety

Following the opening of the Transitway in 1992, crash rates on Campus Connector buses increased dramatically. The Transitway opened with 7 at-grade intersections, of which only 2 were equipped with traffic signals to stop traffic. The remaining grade crossings were located at infrequently-used side streets, and were equipped only with stop signs.[11]: 13 

A 1996 study of Transitway stop-sign intersections found that 20% of the drivers of vehicles crossing the Transitway were not looking both ways, and 50% were not fully stopping. In response, the university added more signage to Transitway intersections, and installed warning devices that alerted cross traffic when a bus was due to approach the intersection. Additionally, sight lines were improved at the intersections by trimming brush and removing street parking.[11]: 6, 20 

Despite these improvements, crashes continue to occur. In 2011, a truck failed to stop at a Transitway intersection, colliding with a bus and injuring 4 people.[12]

References

  1. ^ "Parking & Campus Transit System" (PDF). University of Minnesota. August 2021.
  2. ^ Regents of the University of Minnesota (February 8, 2019). "Traffic Regulation Ordinances" (PDF). Retrieved August 29, 2024.
  3. ^ "Campus Connector (#121) | Parking & Transportation Services". University of Minnesota. Retrieved August 29, 2024.
  4. ^ "New, returning transit options for the 2024 Minnesota State Fair". MPR News. July 22, 2024. Retrieved August 29, 2024.
  5. ^ "Charter Bus Parking". Minnesota State Fair. Retrieved August 29, 2024.
  6. ^ a b Hopfensperger, Jean (May 24, 1990). "Busway to connect two university campuses moves nearer to reality". Star Tribune. p. 1B.
  7. ^ Berg, Steve (August 20, 1986). "Congressman dips into pork barrel to bring home bacon". Star Tribune. p. 15A.
  8. ^ Hamburger, Tom (October 26, 1992). "Fifth District has branched out, but its liberal base is broad - Sabo's quiet ways win praise in D.C. but are frustrating to some at home". Star Tribune. p. 1B.
  9. ^ Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  10. ^ Ahern, Don (May 17, 1990). "Busway Connecting U Campuses Nears Approval". Saint Paul Pioneer Press. p. 1D.
  11. ^ a b Scallen, Stephen; Stackhouse, Stirling (November 1998). Human Factors for Transitway Safety Improvement: Final Report for Phase II. University of Minnesota. Retrieved August 29, 2024.
  12. ^ Jensen, Jill (November 1, 2011). "Truck hits campus connector, four injured". The Minnesota Daily. Retrieved August 29, 2024.

44°58′27″N 93°11′58″W / 44.97429°N 93.19953°W / 44.97429; -93.19953