Langbahn Team – Weltmeisterschaft

14th Street/Sixth Avenue station

 14 Street/6 Avenue
 "1" train"2" train"3" train"F" train"F" express train"L" train"M" train
New York City Subway station complex
Stair and elevator entrances, on the northeast corner of 6th Avenue and 14th Street
Station statistics
AddressWest 14th Street, Sixth & Seventh Avenues
New York, New York
BoroughManhattan
LocaleChelsea, Greenwich Village
Coordinates40°44′14″N 73°59′48″W / 40.737328°N 73.996796°W / 40.737328; -73.996796
DivisionA (IRT), B (BMT, IND)[1]
LineIRT Broadway–Seventh Avenue Line
BMT Canarsie Line
IND Sixth Avenue Line
Services   1 all times (all times)
   2 all times (all times)
   3 all except late nights (all except late nights)​
   F all times (all times) <F> two rush hour trains, peak direction (two rush hour trains, peak direction)
   L all times (all times)​
   M weekdays during the day (weekdays during the day)​
TransitBus transport NYCT Bus: M7, M14A SBS, M14D SBS, M20, M55
Port Authority Trans-Hudson PATH: JSQ–33, HOB–33, JSQ–33 (via HOB) (at 14th Street)
Levels3
Other information
OpenedJuly 1, 1918; 106 years ago (1918-07-01) (Seventh Avenue Line platforms)
September 24, 1924; 100 years ago (1924-09-24) (Canarsie Line platform)
December 15, 1940; 84 years ago (1940-12-15) (Sixth Avenue Line platforms)
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990 ADA-accessible (Transfer passageways between IND Sixth Avenue Line platforms and BMT Canarsie Line platform are not accessible; OMNY farecard readers must be used to transfer between IND Sixth Avenue Line platforms and other services)
Traffic
202311,328,347[2]Increase 28.8%
Rank15 out of 423[2]
Location
14th Street/Sixth Avenue station is located in New York City Subway
14th Street/Sixth Avenue station
14th Street/Sixth Avenue station is located in New York City
14th Street/Sixth Avenue station
14th Street/Sixth Avenue station is located in New York
14th Street/Sixth Avenue station
Street map

Map

Station service legend
Symbol Description
Stops all times except late nights Stops all times except late nights
Stops all times Stops all times
Stops rush hours in the peak direction only (limited service) Stops rush hours in the peak direction only (limited service)
Stops weekdays during the day Stops weekdays during the day

The 14th Street/Sixth Avenue station is an underground New York City Subway station complex in the Greenwich Village and Chelsea neighborhoods of Manhattan, on the IRT Broadway–Seventh Avenue Line, the BMT Canarsie Line and the IND Sixth Avenue Line. It is located on 14th Street between Sixth Avenue (Avenue of the Americas) and Seventh Avenue. It is served by the 1, 2, F, and L trains at all times, by the 3 train at all times except late nights, the M train during weekdays, and the <F> train during rush hours in the peak direction.

A connection is available from this complex to the PATH station at 14th Street and Sixth Avenue. There is a direct passageway from this complex to the PATH station's southbound platform; transferring between this complex and the northbound PATH platform requires exiting onto street level first.

History

Dual Contracts construction

After the opening of the original subway line, operated by the Interborough Rapid Transit Company (IRT), the New York City government began planning new lines. As part of the proposed Tri-borough system, both the IRT and the Brooklyn Rapid Transit Company (BRT; later the Brooklyn–Manhattan Transit Corporation or BMT) wished to develop an east–west line under 14th Street in Manhattan.[3][4] The IRT also sought to operate a north–south route in Manhattan along Seventh Avenue south of Times Square.[5] The Seventh Avenue and 14th Street lines were both assigned to the BRT in 1911 after the IRT refused to agree to a compromise over the Tri-borough system.[6][7]

By mid-1912, the Public Service Commission was determining the locations of stations on the Seventh Avenue Line. The commission wished to add express stops at 34th Street–Penn Station to the north and Chambers Street to the south, but The New York Times reported that the 14th Street station would likely be a local stop because businesses had begun moving away from 14th Street.[8] In September 1912, merchants near 14th Street began advocating for the construction of an express station there, saying the Chambers Street and 34th Street stations were 2.5 miles (4.0 km) apart.[9][10] Merchants on 23rd Street, conversely, advocated for the construction of an express stop on that street because businesses were moving to 23rd Street.[11]

Broadway–Seventh Avenue Line

The Dual Contracts between the government of New York City, the BMT, and the IRT were signed in 1913.[12] As part of Contract 4, the IRT agreed to build a branch of the original subway line south down Seventh Avenue, Varick Street, and West Broadway to serve the West Side of Manhattan.[13][14][15] The construction of this line, in conjunction with the construction of the Lexington Avenue Line, would change the operations of the IRT system. Instead of having trains go via Broadway, turning onto 42nd Street, before finally turning onto Park Avenue, there would be two trunk lines connected by the 42nd Street Shuttle. The system would be changed from looking like a "Z" system on a map to an "H" system. One trunk would run via the new Lexington Avenue Line down Park Avenue, and the other trunk would run via the new Seventh Avenue Line up Broadway. In order for the line to continue down Varick Street and West Broadway, these streets needed to be widened, and two new streets were built, the Seventh Avenue Extension and the Varick Street Extension.[16] It was predicted that the subway extension would lead to the growth of the Lower West Side, and to neighborhoods such as Chelsea and Greenwich Village.[17][18]

As part of the Dual Contracts, the IRT was authorized to construct an express station on its Seventh Avenue Line at 14th Street.[19][20] The Christopher Street and 14th Street stations were to be built as part of section 4 of the Seventh Avenue Line, running between Commerce Street and 16th Street.[21][22] This contract was awarded in March 1914 to the United States Realty and Investment Company, who made a low bid of $1.837 million.[23][24] By early 1917, the section of the Seventh Avenue Line from 14th to 42nd Street was nearly complete, and workers were restoring the portion of Seventh Avenue between 14th and 42nd Streets.[25][26] A short section of the new line opened between 42nd Street and 34th Street–Penn Station in June 1917.[27] A further extension from 34th to 14th Street was initially scheduled to open by the end of the year,[28] but the extension to 14th Street was still incomplete by that December.[29]

14th Street opened as part of an extension of the line from 34th Street–Penn Station to South Ferry on July 1, 1918.[30][31] Initially, the station was served by a shuttle running from Times Square to South Ferry.[30][32] The new "H" system was implemented on August 1, 1918, joining the two halves of the Broadway–Seventh Avenue Line and sending all West Side trains south from Times Square.[33][34] An immediate result of the switch was the need to transfer using the 42nd Street Shuttle. The completion of the "H" system doubled the capacity of the IRT system.[17]

Canarsie Line

The Dual Contracts also called for the construction of a subway under 14th Street, to run to Canarsie in Brooklyn; this became the Canarsie Line. The BRT was authorized to construct a station on its Canarsie Line at Sixth Avenue and 14th Street.[19][20] In late 1915, the Public Service Commission began receiving bids for the construction of the 14th Street Line.[35][36] Booth and Flinn was awarded the first contract for the line, namely a tunnel under the East River, in January 1916.[37] At the time, the Public Service Commission was completing plans for the rest of the line;[38] the commission began accepting bids for two parts of the line within Manhattan, sections 1 and 2. in April 1916.[39] The next month, Booth and Flinn won the contract for section 1, which was to cost $2.528 million.[40] By early 1919, the section of the line under 14th Street was about 20 percent completed.[41]

In 1922, the Charles H. Brown & Son Corporation was contracted to build out the Canarsie Line's stations in Manhattan, including the Sixth Avenue station.[42] Track-laying in the tunnels between Sixth and Montrose Avenues started in the last week of October 1922.[43][44] The Canarsie Line's Sixth Avenue station opened on June 30, 1924, as the terminal of the 14th Street–Eastern Line, which ran from Sixth Avenue under the East River and through Williamsburg to Montrose and Bushwick Avenues.[45][46] Service was extended east to Canarsie on July 14, 1928, but continued to terminate at Sixth Avenue.[47][48] The new line reduced overcrowding at the Canal Street station in Lower Manhattan.[49]

Sixth Avenue Line

New York City mayor John Francis Hylan's original plans for the Independent Subway System (IND), proposed in 1922, included building over 100 miles (160 km) of new lines and taking over nearly 100 miles (160 km) of existing lines, which would compete with the IRT and the BMT, the two major subway operators of the time.[50][51] The New York City Board of Transportation (BOT) approved the IND Sixth Avenue Line in 1925; the line was to run from Midtown Manhattan underneath Sixth Avenue, Houston Street, Essex Street, and the Rutgers Street Tunnel to Downtown Brooklyn.[52] The IND Sixth Avenue Line was designed to replace the elevated IRT Sixth Avenue Line.[53]

The Midtown section of the Sixth Avenue Line was difficult to construct because part of this stretch of Sixth Avenue was already occupied by the Hudson & Manhattan Railroad (H&M)'s Uptown Hudson Tubes, which ran between Eighth and 33rd Streets.[54] As a result, negotiations between the city and the H&M continued for several years.[55] The IND and H&M finally came to an agreement in 1930. The city had decided to build the IND Sixth Avenue Line's local tracks around the pre-existing H&M tubes, and add express tracks for the IND underneath the H&M tubes at a later date.[56] However, the IND had not yet finalized the locations of Sixth Avenue Line stations between 42nd and Fourth Streets because it was still negotiating with the H&M.[57]

The Midtown section of the Sixth Avenue Line did not begin construction until March 1936.[58][59] The final contract for the line, covering the section between 9th and 18th Streets, was awarded to Spencer White & Prentis in June 1937.[60] Workers had to navigate around the various utilities and tunnels above, below, and beside the line.[61][62] The section of the line between 9th and 18th Streets was constructed using compressed air and tunneling shields, in contrast to much of the rest of the line, which was built using a cut-and-cover method.[63] Builders had to use very small charges of dynamite so that they would not disrupt the H&M tunnels alongside the route, the street and elevated line above, and the water main below.[64] The Sixth Avenue Elevated had to be underpinned during construction, and workers had to be careful not to cause cracks in the Catskill Aqueduct, which was located around 200 feet (61 m) below the avenue's surface.[65][61] The H&M's 14th Street station had to be rebuilt to provide space for the IND's 14th Street station, which would be located at a similar elevation.[65]

The Sixth Avenue Line's 14th Street station opened on December 15, 1940, along with the rest of the IND Sixth Avenue Line from West Fourth Street–Washington Square to 47th–50th Streets–Rockefeller Center.[66][67] The opening of the Sixth Avenue Line relieved train traffic on the Eighth Avenue Line, which was used by all IND services except for the G Brooklyn–Queens Crosstown service.[68] When the Sixth Avenue Line's 14th Street station opened, the F train served the station at all times.[69][70]

Consolidation as a station complex

The city government took over the BMT's operations on June 1, 1940,[71][72] and the IRT's operations on June 12, 1940.[73][74] In 1947, the New York City Board of Transportation (BOT) replaced the incandescent lightbulbs in the Sixth Avenue Line's 14th Street station with fluorescent lamps as part of an experiment to improve illumination in subway stations.[75]

A free transfer between the Canarsie Line platform and the Sixth Avenue Line platforms opened on May 9, 1966.[76] On January 16, 1978, a free transfer passageway connecting the 14th Street station on the IRT Broadway–Seventh Avenue Line and the stations on the BMT Canarsie Line and the IND Sixth Avenue Line opened.[77]

Accessibility improvements

The transfer passageway in 2008, prior to renovation
The renovated transfer passageway in 2024

In 2018, the MTA allocated some funding for Americans with Disabilities Act of 1990 (ADA) improvements at the Sixth Avenue/14th Street station.[78] Originally, the improvements were scheduled for the Sixth Avenue and Canarsie Lines only.[79][80] The entire station complex except for the PATH station was to receive elevators starting in 2022.[81] As of February 2021, funding had been committed to accessibility renovations at the 14th Street/Sixth Avenue station.[82] A contract for nine elevators at the station complex was awarded in November 2021.[83]

Between February 27, 2023, and December 11, 2023, the transfer passageway between Sixth and Seventh Avenues was closed for the installation of elevators and reconfiguring of the ramp as a part to make the station compliant with the ADA.[84] A free out-of-system transfer was available while the passageway was closed. The work involves constructing nine elevators: two from the IRT platforms to the mezzanine; one from the mezzanine to street level at Seventh Avenue; two from the lower mezzanine levels to the BMT platform; two from each IND platform to upper mezzanine; and two more from both the BMT and IND mezzanine levels to street level at Sixth Avenue.[84][85]

On August 19, 2024, the first three elevators opened, making the northbound IND Sixth Avenue Line platform and the BMT Canarsie Line platform accessible.[86][87] An additional two elevators – one from street level at Seventh Avenue to the IRT mezzanine and another from that mezzanine to the northbound IRT Broadway-Seventh Avenue Line platform – opened on November 2, 2024. The remaining four elevators were opened in mid-December 2024, making the southbound IND Sixth Avenue Line platform, the southbound IRT Broadway-Seventh Avenue Line platform, and the transfer passageway between the IRT Broadway-Seventh Avenue Line platforms and the BMT Canarsie Line platform accessible.[88][89] Work also included the renovation of 39 stairs, the addition of 25 more stairs,[87] and the reopening of a fare control area that was closed in 1992.[90]

Station layout

Ground Street level Exit/entrance
Mezzanine Fare control, station agent
Disabled access Elevators at:
  • Northeast corner of 14th Street and Sixth Avenue for "L" train and northbound "F" train"F" express train"M" train trains
  • Northwest corner of 14th Street and Sixth Avenue for "L" train and southbound "F" train"F" express train"M" train trains
  • Southwest corner of 14th Street and Seventh Avenue for "1" train"2" train"3" train trains
Platform level Northbound local "1" train toward Van Cortlandt Park–242nd Street (18th Street)
"2" train toward Wakefield–241st Street late nights (18th Street)
Island platform Disabled access
Northbound express "2" train toward Wakefield–241st Street (34th Street–Penn Station)
"3" train toward Harlem–148th Street (34th Street–Penn Station)
Southbound express "2" train toward Flatbush Avenue–Brooklyn College (Chambers Street)
"3" train toward New Lots Avenue (Chambers Street)
Island platform Disabled access
Southbound local "1" train toward South Ferry (Christopher Street–Stonewall)
"2" train toward Flatbush Avenue–Brooklyn College late nights (Christopher Street–Stonewall)
B2
Sixth Avenue and
PATH platforms
Northbound local "F" train"F" express train toward Jamaica–179th Street (23rd Street)
"M" train toward Forest Hills–71st Avenue weekdays (23rd Street)
Side platform Disabled access
Side platform
Northbound      HOB–33 weekdays toward 33rd Street (23rd Street)
          JSQ–33 (via HOB weekends) toward 33rd Street (23rd Street)
Southbound      HOB–33 weekdays toward Hoboken (Ninth Street)
          JSQ–33 (via HOB weekends) toward Journal Square (Ninth Street)
Side platform
Side platform Disabled access
Southbound local "F" train"F" express train toward Coney Island–Stillwell Avenue (West Fourth Street–Washington Square)
"M" train weekdays toward Middle Village–Metropolitan Avenue (West Fourth Street–Washington Square)
B3
Canarsie platform
Westbound "L" train toward Eighth Avenue (Terminus)
Island platform Disabled access
Eastbound "L" train toward Canarsie–Rockaway Parkway (Union Square)
B4 Northbound express "B" train"D" train do not stop here
Southbound express "B" train"D" train do not stop here →
  • The IRT Broadway–Seventh Avenue Line platforms and the other lines' platforms are one block apart.
  • The express tracks of the IND Sixth Avenue Line run under the complex but are not part of the station.[91]
  • The PATH platforms are at 14th Street and Sixth Avenue, between the IND Sixth Avenue Line platforms, but require the payment of a separate fare.

IRT Broadway–Seventh Avenue Line platforms

 14 Street
 "1" train"2" train"3" train
New York City Subway station (rapid transit)
View from northbound platform
Station statistics
DivisionA (IRT)[1]
Line   IRT Broadway–Seventh Avenue Line
Services   1 all times (all times)
   2 all times (all times)
   3 all except late nights (all except late nights)
StructureUnderground
Platforms2 island platforms
cross-platform interchange
Tracks4
Other information
OpenedJuly 1, 1918; 106 years ago (1918-07-01)
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990 ADA-accessible (OMNY farecard readers must be used to transfer to IND Sixth Avenue Line platforms)
Opposite-
direction
transfer
Yes
Services
Preceding station New York City Subway New York City Subway Following station
34th Street–Penn Station
2 all times3 all except late nights

Express
Chambers Street
2 all times3 all except late nights
18th Street
1 all times2 late nights

Local
Christopher Street–Stonewall
1 all times2 late nights
Track layout

Station service legend
Symbol Description
Stops all times except late nights Stops all times except late nights
Stops all times Stops all times
Stops late nights only Stops late nights only

The 14th Street station is an express station on the IRT Broadway–Seventh Avenue Line, consisting of four tracks and two island platforms.[92] The local tracks are used by the 1 at all times[93] and by the 2 during late nights;[94] the express tracks are used by the 2 and 3 trains during daytime hours.[94][95] The next stop to the north is 18th Street for local trains and 34th Street–Penn Station for express trains. The next stop to the south is Christopher Street–Stonewall for local trains and Chambers Street for express trains.[96]

The track walls on both sides of the platform have their original IRT mosaic trim line with "14" tablets on it at regular intervals. Both platforms have blue I-beam columns that run along both sides at regular intervals with alternating ones having the standard black station name plate in white lettering.

Exits

This station has three fare control areas. The full-time entrance is at the north end. Two staircases from each platform lead to a crossover that has a newsstand in the center, two now defunct restrooms above the southbound platforms and tracks (mosaic signs reading "MEN" and "WOMEN" remain intact), and two full height turnstiles above the northbound platform and tracks (one entry/exit and one exit-only) leading to a staircase that goes up to the southeast corner of 14th Street and Seventh Avenue.[97] There is also a passageway leading to the BMT Canarsie platforms on Sixth Avenue, which in turn allows a free transfer to the IND Sixth Avenue Line platforms. The full-time turnstile bank at the center of the crossover opposite the newsstand leads to a mezzanine containing a token booth, three staircases going up to the either northern corners as well as the southwest corner of 14th Street and Seventh Avenue.[97] Directional mosaics at the southwest corner entrance also indicate that there was a passage leading to 14th Street/Eighth Avenue; this passage has been closed since 1991 due to safety concerns.[98]

The station has an exit-only area at the center. Two staircases from each platform go up to a crossover where on either side, a single exit-only turnstile and emergency gate leads to a staircase that goes up to either northern corners of 13th Street and Seventh Avenue.[97]

The station has an unstaffed fare control area at the south end. A single staircase from each platform leads to a crossover and a bank of turnstiles as well as one exit-only and one full-height turnstile. The mezzanine has a now-unused customer assistance booth and two staircases going up to both northern corners of 12th Street and Seventh Avenue.[97]

IND Sixth Avenue Line platforms

 14 Street
 "F" train"F" express train"M" train
New York City Subway station (rapid transit)
Northbound platform
Station statistics
DivisionB (IND)[1]
Line   IND Sixth Avenue Line
Services   F all times (all times) <F> two rush hour trains, peak direction (two rush hour trains, peak direction)
   M weekdays during the day (weekdays during the day)
Platforms2 side platforms
Tracks2
Other information
OpenedDecember 15, 1940; 84 years ago (1940-12-15)
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990 ADA-accessible (OMNY farecard readers must be used to transfer to other services)
Opposite-
direction
transfer
Yes
Services
Preceding station New York City Subway New York City Subway Following station
23rd Street
F all times <F> two rush hour trains, peak directionM weekdays during the day

Local
West Fourth Street–Washington Square
F all times <F> two rush hour trains, peak directionM weekdays during the day
"B" train and "D" train do not stop here
Track layout

14th Street (NYCS)
14th Street (PATH)
Sixth Ave Line to W Fourth St
PATH to Ninth Street
Station service legend
Symbol Description
Stops all times Stops all times
Stops all times except late nights Stops all times except late nights
Stops weekdays during the day Stops weekdays during the day
Stops rush hours in the peak direction only (limited service) Stops rush hours in the peak direction only (limited service)

The 14th Street station is a local station on the IND Sixth Avenue Line, and has two side platforms to the inside of the tracks. The station is served by the F at all times[99] and by the M on weekdays during the day.[100] It is between 23rd Street to the north and West Fourth Street–Washington Square the south.[96]

Both platforms have a green trim line on a darker green border and mosaic name tablets reading "14TH STREET" in white sans-serif lettering on a dark green background and a lighter green border. Beneath the trim line and name tablets are small directional and number tile captions in white lettering on a black background. Forest green I-beam columns run along both platforms at regular intervals with alternating ones having the standard black name plate with white lettering.

Trains open their doors to the left in both directions, which is unusual for a side platformed station in New York City. Most side platforms in the system are to the outside of the tracks and thus trains open the doors to the right. In the case of 14th Street, because the platforms of the PATH's Uptown Hudson Tubes already existed along Sixth Avenue, the Sixth Avenue Line platforms flank the existing PATH station, leaving the PATH tracks behind the Sixth Avenue platform walls which are not visible from the platforms.[91]

The Sixth Avenue express tracks used by the B and D are at a lower level beneath the PATH tracks and are also not visible from the platforms. The deep-bore tunnel's round shape becomes square below this station and at 23rd Street, where provisions for lower-level platforms were built.[101]

There is a full length mezzanine over the platforms and tracks.[91]

Exits

There are entrance/exits at both 14th Street and 16th Street, with fare controls at both ends. The 14th Street entrance is shared with the PATH station of the same name, which has a separate fare control.[97] At both intersections, exits lead to all four corners.[97] At the extreme south end of each platform, there is a single-wide stairway descending to the Canarsie Line platform.

BMT Canarsie Line platform

 6 Avenue
 "L" train
New York City Subway station (rapid transit)
Northbound R143 L train departing
Station statistics
DivisionB (BMT)[1]
Line   BMT Canarsie Line
Services   L all times (all times)
StructureUnderground
Platforms1 island platform
Tracks2
Other information
OpenedJune 30, 1924; 100 years ago (1924-06-30)
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990 ADA-accessible (OMNY farecard readers must be used to transfer to IND Sixth Avenue Line platforms)
Opposite-
direction
transfer
Yes
Services
Preceding station New York City Subway New York City Subway Following station
Eighth Avenue
Terminus
Union Square
Track layout

Station service legend
Symbol Description
Stops all times Stops all times
Stops all times except late nights Stops all times except late nights

The Sixth Avenue station on the BMT Canarsie Line has one island platform and two tracks. The station is served by the L at all times.[102] It is between Eighth Avenue to the west and Union Square to the east.[96]

Mosaic tablet on track wall

The station is approximately 40 feet (12 m) below street level. Both track walls have their original mosaic trim line consisting of earthy tones of olive green, brown, ochre and tan augmented by light green and Copenhagen blue. "6" tablets representing "Sixth Avenue" run along the trim line at regular intervals.[103] West of the station, a center lay-up track begins at a bumper block and is only accessible from the Eighth Avenue terminal.[104] This station was the terminal for the BMT Canarsie Line until the Eighth Avenue station opened in 1931.[105]

The 1993 artwork here is called MTA Jewels by Jennifer Kotter.[106] It consists of paintings of various subjects on the passageway leading to the IRT.

Exits

The station has seven staircases going up from the platform. The two westernmost ones go up to a passageway that leads to the full-time fare control area at the IRT Broadway–Seventh Avenue Line station. The next two go up to the extreme south ends of either platform of the IND Sixth Avenue Line station. The western staircase goes to the southbound platform, and the one directly east of it goes to the northbound platform

The next two staircases go up to a mezzanine leading to fare control that has a powder blue and state blue trim line. A bank of three regular turnstiles and two high entry/exit turnstiles provide entrance/exit from the station and there is no token booth. Two staircases go up to either eastern corners of 14th Street and Sixth Avenue.[97] Another unstaffed bank of turnstiles by the northeast staircase leads to the mezzanine above the Queens-bound platform of 14th Street on the IND.[97]

The last staircase on the extreme east end of the platform leads to a storage area and ventilation room. Another staircase in this section has been removed.

References

  1. ^ a b c d "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  3. ^ "Interboro Makes New Offer; East, It Says: Ready to Spend $99,524,500 for Construction and Equipment of New Subways". New-York Tribune. May 10, 1911. p. 1. ISSN 1941-0646. ProQuest 574764906.
  4. ^ "New Interboro Subway Offer in; Would Spend $24,000,000 More and Yields on Matter of Elevated Extensions". The New York Times. May 10, 1911. ISSN 0362-4331. Retrieved July 15, 2023.
  5. ^ "7th Avenue Subway Next to Be Built; Public Service Engineers Now Working on Three Separate Routes". The New York Times. May 30, 1910. ISSN 0362-4331. Retrieved July 15, 2023.
  6. ^ "Award to B.R.T.' Interboro Out; Shonts Has Until Next Thursday to Reply, but Says Subway Terms Are Impossible". The New York Times. July 1, 1911. ISSN 0362-4331. Retrieved July 15, 2023.
  7. ^ "Subway Report Divides New Franchises Between B.R.T. Co. and the Interborough". The Brooklyn Citizen. June 13, 1911. p. 1. Retrieved July 15, 2023 – via Newspapers.com.
  8. ^ "Express Stations on New Subways; Physical Conditions Fix the Locations of Some of Them Without Argument". The New York Times. June 9, 1912. ISSN 0362-4331. Retrieved July 15, 2023.
  9. ^ "Another Brisk Fight for Subway Stops; Fourteenth Street Gives More Effort to Getting an Express Station on Seventh Av. Line". The New York Times. September 17, 1912. ISSN 0362-4331. Retrieved May 5, 2023.
  10. ^ "14th Street Asks Express: Seventh Avenue Property Owners Appear Before P. S. C.". New-York Tribune. September 17, 1912. p. 16. ISSN 1941-0646. ProQuest 574963651.
  11. ^ "Rival Streets Fight for Express Stops; Fourteenth Contends with Twenty-third as Important Business Centres". The New York Times. September 14, 1912. ISSN 0362-4331. Retrieved July 15, 2023.
  12. ^ "Money Set Aside for New Subways; Board of Estimate Approves City Contracts to be Signed To-day with Interboro and B.R.T." (PDF). The New York Times. March 19, 1913. ISSN 0362-4331. Archived (PDF) from the original on July 7, 2021. Retrieved November 10, 2017.
  13. ^ "Terms and Conditions of Dual System Contracts". nycsubway.org. Public Service Commission. March 19, 1913. Archived from the original on May 13, 2015. Retrieved February 16, 2015.
  14. ^ "The Dual System of Rapid Transit (1912)". nycsubway.org. Public Service Commission. September 1912. Archived from the original on January 26, 2021. Retrieved May 30, 2017.
  15. ^ "Most Recent Map of the Dual Subway System Which Shows How Brooklyn Borough Is Favored In New Transit Lines". The Brooklyn Daily Eagle. September 9, 1917. p. 37. Archived from the original on October 26, 2016. Retrieved August 23, 2016 – via Brooklyn Public Library; newspapers.com.
  16. ^ Engineering News-record. Vol. 75. McGraw-Hill Publishing Company. 1916. p. 846.
  17. ^ a b Whitney, Travis H. (March 10, 1918). "The Seventh and Lexington Avenue Subways Will Revive Dormant Sections — Change in Operation That Will Transform Original Four-Tracked Subway Into Two Four-Tracked Systems and Double Present Capacity of the Interborough" (PDF). The New York Times. p. 12. Retrieved August 26, 2016.
  18. ^ "Public Service Commission Fixes July 15 For Opening of The New Seventh and Lexington Avenue Subway Lines" (PDF). The New York Times. May 19, 1918. p. 32. Retrieved November 6, 2016.
  19. ^ a b "Station Sites for New Subways; Pamphlet Issued by Utilities Board Contains List of Stops on Dual System". The New York Times. July 6, 1913. ISSN 0362-4331. Archived from the original on February 13, 2023. Retrieved May 20, 2023.
  20. ^ a b "Dual Subway Stations: Protesting Owners Should File Petitions for Changes". New-York Tribune. May 4, 1913. p. C8. ISSN 1941-0646. ProQuest 575088610.
  21. ^ "P. S. Board Fights to Have a Quorum". The Standard Union. Brooklyn. March 2, 1914. p. 2. Retrieved July 15, 2023 – via Newspapers.com.
  22. ^ "More Subway Construction". The Wall Street Journal. February 7, 1914. p. 7. ISSN 0099-9660. ProQuest 129538875.
  23. ^ "Another Subway Contract is Let". The Christian Science Monitor. March 7, 1914. p. 4. ProQuest 509041523.
  24. ^ "Subway Bids". The Brooklyn Citizen. March 3, 1914. p. 2. Retrieved July 16, 2023 – via Newspapers.com.
  25. ^ "Soon to Restore 7th Av.; Subway Far Enough Along for Temporary Pavement to be Laid". The New York Times. March 18, 1917. ISSN 0362-4331. Retrieved July 16, 2023.
  26. ^ "163 Miles of Transit Routes Soon Ready". The Standard Union. Brooklyn. March 25, 1917. p. 8. Retrieved July 16, 2023 – via Newspapers.com.
  27. ^ "New Subway Opened". New-York Tribune. June 4, 1917. p. 5. ProQuest 575722451.
  28. ^ "Tube to 42d St. by December". The Brooklyn Citizen. September 23, 1917. p. 8. Retrieved July 16, 2023 – via Newspapers.com.
  29. ^ "Dual Subway Lines to Be 90 Per Cent. Complete in Year". The Brooklyn Daily Eagle. December 29, 1917. p. 7. Retrieved July 16, 2023 – via Newspapers.com.
  30. ^ a b "7th Avenue Subway System Is Opened To Public To-day: First Train Will Start at 2 O'Clock This Afternoon". New-York Tribune. July 1, 1918. p. 9. ProQuest 575909557.
  31. ^ "Open New Subway to Regular Traffic" (PDF). The New York Times. July 2, 1918. p. 11. Retrieved November 6, 2016.
  32. ^ "Times Sq. Grows as Subway Centre: New Seventh Avenue Line, Open Today, Marks Great Transportation Advance". The New York Times. July 1, 1917. p. RE11. ISSN 0362-4331. ProQuest 99994412. Retrieved November 22, 2022.
  33. ^ "Open New Subway Lines to Traffic; Called a Triumph — Great H System Put in Operation Marks an Era in Railroad Construction — No Hitch in the Plans — But Public Gropes Blindly to Find the Way in Maze of New Stations — Thousands Go Astray — Leaders in City's Life Hail Accomplishment of Great Task at Meeting at the Astor". The New York Times. August 2, 1918. p. 1. Archived from the original on January 6, 2021. Retrieved November 6, 2016.
  34. ^ "New "H" System Brings Worst Subway Jam". New-York Tribune. August 2, 1918. pp. 1, 6. Archived from the original on May 31, 2023. Retrieved May 30, 2023 – via Newspapers.com.
  35. ^ "Progress of Work on New Branches of the Dual Subway System". The New York Times. November 21, 1915. ISSN 0362-4331. Retrieved July 15, 2023.
  36. ^ "$182,000,000 Being Spent on Subways in New York City". The Brooklyn Daily Eagle. December 26, 1915. p. 10. Retrieved July 16, 2023 – via Newspapers.com.
  37. ^ "East River Tunnel Contract Awarded; Booth & Flinn, Who Will Do the Work for $6,639,023, to Use the Shield Method". The New York Times. January 14, 1916. ISSN 0362-4331. Retrieved July 16, 2023.
  38. ^ "Public Service Commission Promises to Complete Contract Awards This Year". The Brooklyn Daily Eagle. January 16, 1916. p. 40. Retrieved July 16, 2023 – via Newspapers.com.
  39. ^ "E. D. Tube Trains Will Run in 1918". Times Union. April 8, 1916. p. 15. Retrieved July 16, 2023.
  40. ^ "Award Subway Contracts". Times Union. Brooklyn. May 26, 1916. p. 6. Retrieved July 16, 2023 – via Newspapers.com.
  41. ^ "When Will Dual Subway Be Finished?: Completed Work Cost 188,332,000--unfinished Contracts Amount to 20,000,000 Two Bodies Responsible for Construction Lack Mutual Confidence and Team-work". New-York Tribune. January 5, 1919. p. D10. ISSN 1941-0646. ProQuest 575999620.
  42. ^ "Long Delayed E. D. Transit Relief Move Announced". The Standard Union. Brooklyn. October 29, 1922. pp. 9, 11. Retrieved June 11, 2021 – via Newspapers.com.
  43. ^ "Laying of Tracks Starts New Action for Thru Tubes". The Chat. Brooklyn. November 4, 1922. p. 18. Retrieved June 11, 2021 – via Newspapers.com.
  44. ^ "Long Delayed E. D. Transit Relief Move Announced". The Standard Union. Brooklyn. October 29, 1922. pp. 9, [1]. Retrieved July 16, 2023 – via Newspapers.com.
  45. ^ "Celebrate Opening of Subway Link" (PDF). The New York Times. July 1, 1924. p. 23. Retrieved February 13, 2010.
  46. ^ "Whole City to Celebrate E. D. Subway Opening Tomorrow". Times Union. Brooklyn. June 29, 1924. p. 8. Retrieved June 11, 2021 – via Newspapers.com.
  47. ^ "Celebrate Opening of New B. M. T. Line; Officials and Civic Association Members Fill First Train From Union Square". The New York Times. July 15, 1928. ISSN 0362-4331. Archived from the original on December 10, 2021. Retrieved April 28, 2023.
  48. ^ "Communities in Gala Attire Awaiting 'First Train' in New Subway". The Chat. Brooklyn. July 14, 1928. p. 37. Archived from the original on April 28, 2023. Retrieved April 28, 2023 – via Newspapers.com.
  49. ^ "14th St. Tube Eases Jams; Transit Board Reports Drop in Transfers Issued at Canal Street". The New York Times. August 17, 1928. ISSN 0362-4331. Archived from the original on April 28, 2023. Retrieved April 28, 2023.
  50. ^ "Two Subway Routes Adopted by City". The New York Times. August 4, 1923. p. 9. ISSN 0362-4331. Retrieved August 1, 2019.
  51. ^ "Plans Now Ready to Start Subways". The New York Times. March 12, 1924. p. 1. ISSN 0362-4331. Retrieved August 1, 2019.
  52. ^ "New Subway Routes in Hylan Program to Cost $186,046,000 – Board of Transportation Adopts 22.90 Miles of Additional Lines – Total Now $345,629,000 – But the Entire System Planned by Mayor Involves $700,000,000 – Description of Routes – Heaviest Expenditures Will Be Made on Tunnels – No Allowance for Equipment – New Subway Routes to Cost $186,046,000". The New York Times. March 21, 1925. ISSN 0362-4331. Retrieved April 8, 2018.
  53. ^ "Delaney For Razing Elevated Line Now; Work in 6th Av. Could Begin in Six Months if Condemnation Started at Once, He Says. Sees Cut In Subway Cost Eliminating Need for Underpinning Would Save $4,000,000 and Speed Construction, He Holds". The New York Times. January 11, 1930. ISSN 0362-4331. Retrieved April 27, 2018.
  54. ^ "6th Av. Subway Plan Hinges On Tubes' Use; City Must Reach Agreement With Hudson & Manhattan to Carry Out Project". The New York Times. November 20, 1924. ISSN 0362-4331. Archived from the original on April 26, 2018. Retrieved April 26, 2018.
  55. ^ "Final Contracts To Finish Subway Awarded By City; Include $20,000,000 for Cars, Equipment and Substations for Manhattan Line. Operation Set For 1931 Board of Transportation Moves to Rid Sixth Avenue of Trolley Tracks. Seeks To Buy Franchise Line Willing to Exchange It for Bus Permit—Negotiations Pushed to Extend Tube". The New York Times. August 1, 1929. ISSN 0362-4331. Archived from the original on April 26, 2018. Retrieved April 26, 2018.
  56. ^ "Delaney For Razing Elevated Line Now; Work in 6th Av. Could Begin in Six Months if Condemnation Started at Once, He Says. Sees Cut In Subway Cost Eliminating Need for Underpinning Would Save $4,000,000 and Speed Construction, He Holds". The New York Times. January 11, 1930. ISSN 0362-4331. Archived from the original on April 28, 2018. Retrieved April 27, 2018.
  57. ^ "104 Station Sites for City's Subways Chosen by Board; The Layout Calls for 39 in Manhattan, 30 in Brooklyn, 25 in Queens, 10 in Bronx". The New York Times. June 2, 1930. ISSN 0362-4331. Archived from the original on June 30, 2018. Retrieved July 14, 2022.
  58. ^ "Mayor to Start Work on Sixth Av. Subway; La Guardia to Use Pneumatic Drill at Ceremony at Noon Tomorrow in Bryant Park". The New York Times. March 22, 1936. ISSN 0362-4331. Retrieved July 10, 2022.
  59. ^ "Mayor Starts Construction of 6th Av. Subway: Demands Razing of 'El' as He Breaks Ground at Bryant Park Entrance Appeals for Unification Warns Rate War Is Likely to Follow Failure of Plan". New York Herald Tribune. March 24, 1936. p. 9. ProQuest 1222069808.
  60. ^ "6th Ave. Subway Contract Let". New York Herald Tribune. June 16, 1937. p. 19. ProQuest 1240440213.
  61. ^ a b Harrington, John W. (May 5, 1935). "City Plans Its Costliest Subway; In a Short Two Miles Under Sixth Avenue the Engineers Will Encounter Many Intricate Problems". The New York Times. ISSN 0362-4331. Retrieved April 28, 2018.
  62. ^ "The Tube Takes Shape in 6th Av.: Most of the Excavation Is Done, And, Considering, Done Quietly: Despite the Intricacies of Underground Utility Facilities and Overhead Elevated Line, There Are Fewer Inconveniences and Complaints on Tliis Project Than Construction Usually Brings". New York Herald Tribune. November 7, 1937. p. A3. ProQuest 1223317978.
  63. ^ Vogel, W. P. Jr. (July 11, 1937). "Work to Begin On Last 6th Av. Tube Link Soon: With 9th-18th St. Contract Let, $57,000,000 Project Will Be Ready in 1941 No Federal Aid for City Man-Made, Natural Hazards Pose Many Problems". New York Herald Tribune. p. A3. ISSN 1941-0646. ProQuest 1248809011.
  64. ^ "Transit Body Pushes 6th Av. Subway Plan; Commission Approves Changes in Hudson Tubes to Permit Start of Building". The New York Times. August 14, 1935. ISSN 0362-4331. Retrieved April 28, 2018.
  65. ^ a b "New Subway Line on 6th Ave. Opens at Midnight Fete". The New York Times. December 15, 1940. p. 1. ISSN 0362-4331. Retrieved October 7, 2011.
  66. ^ "First-Day Traffic on 6th Ave. Line Greatly Exceeds All Expectations; But Real Test of New Subway Will Come in Today's Rush Hours--Mezzanine Corridor Evokes General Approval". The New York Times. December 16, 1940. ISSN 0362-4331. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  67. ^ "6th Av. Subway Opens Complete Service Today: Rush-Hour Schedules On at 7 A. M.; Bronx and Queens To Be Affected". New York Herald Tribune. December 16, 1940. p. 10. ProQuest 1263396247.
  68. ^ "New Subway to Add 2 Need Services – Opening of 6th Ave. Line to Provide Uptown Local Route and More Queens Expresses". The New York Times. December 2, 1939. ISSN 0362-4331. Archived from the original on April 16, 2018. Retrieved April 15, 2018.
  69. ^ "6th Ave. Tube Adds Two New Services – Provides Express Facilities to Queens and Local Trains to Washington Heights – Subway Opens on Dec. 15 – Changes in Routings on Other Lines to Bring Faster Time and Less Congestion". The New York Times. December 5, 1940. ISSN 0362-4331. Archived from the original on June 17, 2018. Retrieved April 15, 2018.
  70. ^ "6th Av. Subway To Run 24-Hour Bronx Express: Schedule of Trains Posted for Opening, at 12:01 A. M. on Sunday, Dec. 15". New York Herald Tribune. December 5, 1940. p. 15. ProQuest 1263335131.
  71. ^ "B.M.T. Lines Pass to City Ownership; $175,000,000 Deal Completed at City Hall Ceremony-- Mayor 'Motorman No. 1'". The New York Times. June 2, 1940. ISSN 0362-4331. Archived from the original on July 19, 2021. Retrieved May 14, 2022.
  72. ^ "City Takes Over B. M. T. System; Mayor Skippers Midnight Train". New York Herald Tribune. June 2, 1940. p. 1. ProQuest 1243059209.
  73. ^ "City Transit Unity Is Now a Reality; Title to I.R.T. Lines Passes to Municipality, Ending 19-Year Campaign". The New York Times. June 13, 1940. ISSN 0362-4331. Archived from the original on January 7, 2022. Retrieved May 14, 2022.
  74. ^ "Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration". New York Herald Tribune. June 13, 1940. p. 25. ProQuest 1248134780.
  75. ^ "6th Av. Subway Testing Fluorescent Station Light: City Tries Fluorescent Lights on Subway Station". New York Herald Tribune. May 13, 1947. p. 10. ISSN 1941-0646. ProQuest 1291305719.
  76. ^ "Free Transfer Planned For Canarsie Subway". The New York Times. May 9, 1966. ISSN 0362-4331. Retrieved April 28, 2023.
  77. ^ "Add 3 Subway Transfers". New York Daily News. January 16, 1978. Retrieved November 6, 2018 – via Newspapers.com.
  78. ^ Berger, Paul (June 26, 2018). "MTA Postpones Platform-Safety Pilot Program". Wall Street Journal. ISSN 0099-9660. Retrieved June 26, 2018.
  79. ^ Berger, Paul (June 26, 2018). "MTA Postpones Platform-Safety Pilot Program". Wall Street Journal. ISSN 0099-9660. Retrieved June 26, 2018.
  80. ^ "Elevators are a win, but L-train shutdown fight still on track". The Villager Newspaper. June 21, 2018. Archived from the original on May 5, 2020. Retrieved June 26, 2018.
  81. ^ "ADA Accessibility at 14 Street – 6 Avenue / 7 Avenue Station Complex – Design Only – Capital Plan 2015–2019". mta.info. Metropolitan Transportation Authority. Archived from the original on May 5, 2020. Retrieved November 18, 2018.
  82. ^ "2021 Commitment & Completion Goals". MTA Construction and Development. February 18, 2021. p. 12. Retrieved March 28, 2021.
  83. ^ https://new.mta.info/document/64111 page 184
  84. ^ a b Brachfeld, Ben (February 15, 2023). "Dreaded 14th Street subway passageway to close till December for accessibility work". amNewYork. Retrieved February 18, 2023.
  85. ^ "MTA to Begin Accessibility Improvements at 14 St Passageway Connecting Sixth and Seventh Avenue Subway Lines". mta.info. Metropolitan Transportation Authority. February 14, 2023. Retrieved February 15, 2023.
  86. ^ Liebman, Samantha (August 22, 2024). "MTA unveils new 14th Street elevators despite congestion pricing pause". Spectrum News NY1. Retrieved August 23, 2024.
  87. ^ a b Brachfeld, Ben (August 22, 2024). "Construction finished on three new elevators at 14th Street subway complex". amNewYork. Retrieved August 23, 2024.
  88. ^ "MTA Announces 14 St Station Complex Now Fully Accessible". MTA (Press release). December 19, 2024. Retrieved December 21, 2024.
  89. ^ "4 new elevators open at NYC's 14th Street subway station". CBS New York. December 19, 2024. Retrieved December 21, 2024.
  90. ^ https://www.flickr.com/photos/unionturnpike/48471463127/in/album-72157709193539126
  91. ^ a b c "IND 6th Avenue Line". NYC Subway. Retrieved May 6, 2020.
  92. ^ "Open New Subway to Regular Traffic; First Train on Seventh Avenue Line Carries Mayor and Other Officials ... New Extensions of Elevated Railroad Service … Currents of Travel to Change" (PDF). The New York Times. No. July 2, 1918. July 2, 1918. p. 11. Retrieved April 23, 2015.
  93. ^ "1 Subway Timetable, Effective December 15, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  94. ^ a b "2 Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  95. ^ "3 Subway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  96. ^ a b c "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
  97. ^ a b c d e f g h "MTA Neighborhood Maps: Chelsea" (PDF). Metropolitan Transportation Authority. 2018. Retrieved October 1, 2018.
  98. ^ Moss, Michael (March 29, 1991). "TA Station Closings Draw Fire". Newsday – via ProQuest.
  99. ^ "F Subway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  100. ^ "M Subway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  101. ^ Annual Report 1962–1963. New York City Transit Authority. 1963.
  102. ^ "L Subway Timetable, Effective December 4, 2022". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  103. ^ "BMT Canarsie Line". NYC Subway. Retrieved May 6, 2020.
  104. ^ Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC 49777633 – via Google Books.
  105. ^ "New Subway Connection". Times Union. Brooklyn. May 29, 1931. p. 6. Retrieved April 28, 2023 – via Newspapers.com.
  106. ^ "Artwork: MTA Jewels (Jennifer Kotter)". NYC Subway. Retrieved May 6, 2020.