Langbahn Team – Weltmeisterschaft

Saint Alkmund's Way Footbridge

Saint Alkmunds Way Footbridge
The bridge lit at night with a church in the background
Saint Alkmunds Way Footbridge
Coordinates52°55′37″N 1°28′44″W / 52.927°N 1.479°W / 52.927; -1.479
CarriesPedestrians & Cycles
CrossesSaint Alkmunds Way (A601)
LocaleDerbyshire
Maintained byDerby City Council
Characteristics
Total length45 Metres
Width5 Metres
Height6.2 Metres
History
DesignerDerby City Council. Clive Russel, Mohammed Haque, Phill Massey & Peter Dobson Public Art by:Dennis O’Connor & T4
Construction startAugust 2006
OpenedOctober 2007
Statistics
Daily traffic1,500 (2009 estimates)
TollFree
Location
Map

Saint Alkmund's Way Footbridge is a replacement cycle and footbridge in Derby, England over the A601 (St Alkmund's Way). The 2007 design includes sculptures of silk bobbins at its entrance and exit that are inspired by the nearby Silk Mill museum.

Description

In 2007 Derby City Council demolished and rebuilt the footbridge over St Alkmund's Way to link the city centre with St Mary's Church.[1] It is one of Derby's most-seen bridges and the council worked with Public Artist Denis O'conner and T4 sustainability to design more aesthetically pleasing solution, viewed by an estimated 1,500 pedestrian and 70,000 motorists every day.[1] Funding came from Derby City Council, the Department for Transport and the Derby and Derbyshire Economic Partnership.[1] The final cost was £1.3 million,[2] and the council's contribution was part of a £2 million overspend on highways in 2007.[3]

The bridge design was inspired by the traditional silk route through the city and has given inspiration to the Cathedral Green Footbridge, with its needle-shaped mast,[4] as they both draw inspiration from the Silk Mill and use its heritage as inspiration. Derby Councillor Chris Wynn, cabinet member for planning and highways, said "The design with the bobbins and billowing silk idea will tie in well with the Silk Mill and I think this will be very exciting when it comes to fruition."[5]

The side of the bridge showing one of the silk bobbin sculptures, which are at both ends of the bridge.[6]

The bridge took fourteen weeks to construct, is wider than its predecessor and designed to take cycles and pedestrians.[6] Although a shortage of steel meant that some of the design features and the lighting were not installed when it was nominally complete in October 2007.[2]

References

  1. ^ a b c Hodgekiss, Anna (24 July 2007). "Derby lands £137.9B footbridge". Propertweek.com. Retrieved 3 January 2011.
  2. ^ a b "Bridge to open despite steel woes". BBC News. 26 October 2007. Retrieved 3 January 2011.
  3. ^ "Council explains road overspend". BBC News. 12 April 2007. Retrieved 3 January 2011.
  4. ^ Prime Minister's Award Archived 30 June 2009 at the Wayback Machine, 2009, accessed January 2011
  5. ^ Derby Evening Telegraph, 7 April 2007
  6. ^ a b "Bridging Past and Future" (PDF). Derby.gov.uk. p. 3. Archived from the original (PDF) on 15 June 2011. Retrieved 5 January 2011.