Sadarmat Barrage
Sadarmat Barrage | |
---|---|
Official name | Sadarmat Barrage |
Country | India |
Location | Ponkal village, Mamda mandal, Nirmal district, Telangana |
Coordinates | 18°59′27.9852″N 78°34′16.0104″E / 18.991107000°N 78.571114000°E |
Purpose | Irrigation |
Status | Under construction |
Construction began | 11 January 2017 |
Opening date | 2021 |
Construction cost | 520 Crores |
Built by | Bhrunda Infra Private Limited & Siri Constructions Infrastructure Private Limited (Joint Venture) |
Owner(s) | Government of Telangana |
Operator(s) | Irrigation & CAD Department, Government of Telangana |
Dam and spillways | |
Type of dam | Barrage |
Impounds | Godavari River |
Spillways | 55 gates |
Reservoir | |
Creates | Sadarmat Reservoir |
Total capacity | 1.6 TMC |
Sadarmat Barrage[1][2][3][4] is an under-construction barrage across Godavari River at Ponkal village, Mamda mandal, Nirmal district of Telangana State. This barrage is situated 32 km downstream of Sriram Sagar Project, on the Godavari river and about 7 km upstream of Sadarmat Anicut. The project will provide irrigation facilities for an ayacut of 20,000 acres in Nirmal district of Telangana State.
History
In 1891[5] under the rule of Prime Minister of Hyderabad, Viqar-ul-Umra, Sadarmat Anicut was constructed by the french engineer JJ Ottley at Khanapur mandal in the erstwhile Adilabad district. It's a masonry structure with 2 meters height with a length of 437.4 metres on the left flank and 23.8 metres on the right flank. The estimated cost for construction, then, was about 1 Lakh Indian rupees.
The Sadarmat Anicut has no reliable storage and thus agricultural lands can be irrigated only when there are flows from upper stretches of Godavari river. Sadarmat Barrage will create a pondage of 1.6 TMC, which will create additional ayacut of 20,000 acres as well as stabilise the existing ayacut of 18,000 acres under Sadarmat Anicut.
The foundation stone for construction of the barrage was laid by the Irrigation Minister for Telangana, T. Harish Rao with an estimated construction cost of 520 crores on January 11, 2021.[4]
As part of Sri Ram Sagar Project (SRSP) Rejuvenation Scheme,[6] three house pumps will lift 60 TMC water from the Kaleshwaram Lift Irrigation Project and fill the Sriram Sagar Project project in 69 days, through SRSP Flood Flow Canal. Water from Sriram Sagar Project can be released to Sadarmat Barrage and Sadarmat Anicut via Gravity as it is situated at the downstream of the project. This will provide reliable water supply to ayacut of Sadarmat Barrage and Sadarmat Anicut, even during the drought season in the upper stretches of Godavari.
References
- ^ "Govt Moots Sadarmat Mini-barrage in A'bad". The New Indian Express. Retrieved 2021-01-25.
- ^ India, The Hans (2019-12-24). "Speed up Sadarmat barrage works: CMO Secretary Smitha Sabharwal". www.thehansindia.com. Retrieved 2021-01-25.
- ^ "Implementation of Sadarmatt barrage scheme in Adilabad district - PPP in India". Department of Economic Affairs, Ministry of Finance, Government of India. Archived from the original on May 17, 2023. Retrieved January 25, 2021.
- ^ a b "Laying Foundation Stone For Sadarmatt Barrage :Nirmal - Harish Rao Thanneeru". www.facebook.com. Retrieved 2021-01-25.
- ^ Santosh, Padala. "Living up to expectations after 127 years". Telangana Today. Retrieved 2021-01-25.
- ^ M, Shyam Kumar. "SRSP rejuvenation works on track". Telangana Today. Retrieved 2021-01-25.