Line 5 (Changsha Metro)
Line 5 | |
---|---|
Overview | |
Status | Operational |
Owner | Changsha Government |
Locale | Changsha, Hunan, China |
Termini | |
Stations | 18 |
Service | |
Type | Rapid transit |
System | Changsha Metro |
Services | 1 |
Operator(s) | Changsha Metro Corporation |
History | |
Opened | 28 June 2020 |
Technical | |
Line length | 22.5 km (13.98 mi)[1] |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 5 of the Changsha Metro (Chinese: 长沙地铁五号线; pinyin: Chǎngshā Dìtiě Wǔ Hào Xiàn) is a rapid transit line in Changsha. The line opened on 28 June 2020 with 18 stations.[2][3]
History
Construction started on the line in November 2015, with trial running beginning on 30 December 2019. The line was opened to the public on 28 June 2020.[3]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Maozhutang — Shuiduhe | 28 June 2020 | 22.5 km (13.98 mi)[1] | 18 | Phase 1 |
Rolling stock
The line is operated by 14 six-car Type B trainsets with permanent-magnet traction motors.[3]
Stations
Section | Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
Phase 1 | Maozhutang | 毛竹塘 | ||||
Bantangchong | 板塘冲 | |||||
Datang | 大塘 | |||||
Yuhua District Government | 雨花区政府 | |||||
Muqiao | 木桥 | |||||
Guitang | 圭塘 | 4 | ||||
South Gaoqiao | 高桥南 | |||||
North Gaoqiao | 高桥北 | |||||
Furong District Government | 芙蓉区政府 | 6 | ||||
Wanjiali Square | 万家丽广场 | 2 | ||||
Mawangdui | 马王堆 | |||||
Huojucun | 火炬村 | |||||
Yazipu | 鸭子铺 | |||||
Malanshan | 马栏山 | |||||
North Yuehu Park | 月湖公园北 | 3 | ||||
Baimaopu | 白茅铺 | |||||
Tuqiao | 土桥 | |||||
Shuiduhe | 水渡河 | |||||
References
- ^ a b "长沙地铁3、5号线一期工程将于近期开通初期运营". Archived from the original on June 25, 2020.
- ^ "长沙地铁3号线5号线预计6月28日载客初期运营". 2020-06-25.
- ^ a b c "Changsha opens two more lines". Railway Gazette International. Retrieved 2022-07-19.
External links