Line 2 (Hangzhou Metro)
Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě Èr Hào Xiàn) is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou.[5][6]
The first phase of the line, between Qianjiang Road and Chaoyang stations, entered operation on 24 November 2014 after six years of construction. It was extended to Gucui Road on 3 July 2017, and then to Liangzhu on 27 December in the same year.[6]
During the day, Automatic Train Operation (ATO) is used on the line, which does not require train operators to control the speed of the train manually, however, every night between the hours of 20:30 and 22:30, operators are required to drive the train manually to ensure they still have the ability to drive the train manually in case of exceptional circumstances when ATO is not functional.[7]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Chaoyang — Qianjiang Road | 24 November 2014 | 18.3 km (11.37 mi) | 12 | Phase 1 (southeastern section) |
Qianjiang Century City | 28 April 2016 | Infill station | 1 | |
Qianjiang Road — Gucui Road | 3 July 2017 | 11.3 km (7.02 mi) | 9 | Phase 1 (northwestern section) |
Gucui Road — Liangzhu | 27 December 2017 | 13.32 km (8.28 mi) | 10 | Phase 2 & 3 |
Xianing Bridge | 30 June 2020[8] | Infill station | 1 |
Stations
№ | Station name | Connections | Distance km[9] |
Location | ||
---|---|---|---|---|---|---|
English | Chinese | |||||
1 | Chaoyang | 朝阳 | 0.00 | 0.00 | Xiaoshan | |
2 | Caojiaqiao | 曹家桥 | 1.34 | 1.34 | ||
3 | Panshui | 潘水 | 1.56 | 2.90 | ||
4 | Renmin Road | 人民路 | 1.18 | 4.08 | ||
5 | Hangfachang | 杭发厂 | 1.31 | 5.39 | ||
6 | People's Square | 人民广场 | 5 | 1.16 | 6.55 | |
7 | Jiansheyi Road | 建设一路 | 1.47 | 8.02 | ||
8 | Jianshesan Road | 建设三路 | 7 | 1.15 | 9.17 | |
9 | Zhenning Road | 振宁路 | 1.62 | 10.79 | ||
10 | Feihong Road | 飞虹路 | 1.58 | 12.37 | ||
11 | Yingfeng Road | 盈丰路 | 1.23 | 13.60 | ||
12 | Qianjiang Century City | 钱江世纪城 | 6 | 0.94 | 14.54 | |
13 | Qianjiang Road | 钱江路 | 4 9 | 3.46 | 18.00 | Shangcheng |
14 | Qingchun Square | 庆春广场 | 0.93 | 18.93 | ||
15 | Qingling Road | 庆菱路 | 1.23 | 20.16 | ||
16 | North Jianguo Road | 建国北路 | 5 | 1.47 | 21.63 | Gongshu |
17 | North Zhonghe Road | 中河北路 | 0.93 | 22.56 | ||
18 | Fengqi Road | 凤起路 | 1 | 0.74 | 23.30 | |
19 | Wulinmen | 武林门 | 3 | 1.29 | 24.59 | Gongshu/Xihu |
20 | Shentangqiao | 沈塘桥 | 19 | 1.28 | 25.87 | |
21 | Xianing Bridge | 下宁桥 | 1.15 | 27.02 | Xihu | |
22 | Xueyuan Road | 学院路 | 10 | 0.92 | 27.94 | |
23 | Gucui Road | 古翠路 | 1.11 | 29.05 | ||
24 | Fengtan Road | 丰潭路 | 1.45 | 30.50 | ||
25 | Wenxin | 文新 | 1.29 | 31.79 | ||
26 | Sanba | 三坝 | 5 | 1.16 | 32.95 | |
27 | Xialongwei | 虾龙圩 | 1.19 | 34.14 | ||
28 | Sandun | 三墩 | 1.24 | 35.38 | ||
29 | Dunxiang Street | 墩祥街 | 1.27 | 36.65 | Gongshu | |
30 | Jinjiadu | 金家渡 | 4 | 0.93 | 37.58 | Yuhang |
31 | Baiyang | 白洋 | 1.79 | 39.37 | ||
32 | Dufucun | 杜甫村 | 1.87 | 41.24 | ||
33 | Liangzhu | 良渚 | 1.38 | 42.62 | ||
Rolling stock
Stock | Class | Year built | Builder | Number built | Numbers | Formation | Depots | Line assigned | Notes |
---|---|---|---|---|---|---|---|---|---|
PM066 | B | 2013-2015 | CSR Nanjing Puzhen | 162 (27 sets) | 02 001 - 02 027 (020011-020276) | Tc+Mp+M+M+Mp+Tc | Shushan Depot Shuangqiao Yard |
2 | |
PM098 | 2016-2017 | CRRC Nanjing Puzhen | 102 (17 sets) | 02 028 - 02 044 (020281-020446) | |||||
PM134 | 2018 | 12 (2 sets) | 02 045 - 02 046 (020451-020466) | ||||||
PM138 | 2019-2020 | 120 (20 sets) | 02 047 - 02 066 (020471-020666) |
See also
References
- ^ "杭州地铁2号线车速最高80码 车厢座椅冬天能加热--浙江在线-浙江新闻".
- ^ 杭州地铁2号线24日试运营 列车全天运行15小时. 杭州地铁网. 2014-11-12.
- ^ "今天17时,地铁2号线全程开通 从头坐到尾只需77分钟". 2017-12-27.
- ^ "杭州地铁2号线车速最高80码 车厢座椅冬天能加热--浙江在线-浙江新闻".
- ^ 杭州地铁2号线铺新轨. December 22, 2012.
- ^ a b 杭州地铁2号线一期工程. December 11, 2012. Archived from the original on December 15, 2013.
- ^ Phone call with official office: 0571 5656 7007
- ^ "明天上午10点,下宁桥站、火车南站站同步开通!". 2020-06-29.
- ^ 中铁第四勘察设计院集团有限公司. 杭州地铁二号线二期工程环境影响报告书简本 (Report).