LGV Montpellier–Perpignan
The LGV Montpellier–Perpignan is a planned high-speed rail line between the French cities of Montpellier and Perpignan, at which points it will link with respectively the Contournement Nîmes – Montpellier and the LGV Perpignan–Figueres. The project includes two new stations in Béziers and Narbonne. Montpellier–Béziers and Rivesaltes–Toulouges will be for mixed traffic (freight and passenger), with Béziers–Toulouges being for passenger traffic only.[1]
Route
Shortly after Montpellier-Sud de France station, trains will meet the LGV Montpellier–Perpignan near Maurin.[2]
A parkway station serving Béziers near the A9 and A75 junction is planned.[3] There will also be a classic line allowing trains to call at Béziers station, from which trains can then continue to destinations such as Narbonne and Carcassonne before the Béziers-Perpignan section is complete, through trains in the direction of Perpignan will need to use the parkway station, as there is no link on the other side of Béziers.
The urban centre of Narbonne will be bypassed, but a station will be constructed to the west of the urban centre. This station will be built over the classic line, allowing platform transfers to the line to Carcassonne, as is the case at Valence TGV station. There will also be a triangle junction to the north of this station allowing the line to link with the line to Carcassonne without passing through the urban centre.[4]
The planned line will offer bypasses of all the cities, with link railways to enable connections with existing stations at various points.[5] Passive provision has been made for a connection with the existing LGV Perpignan-Figueres line near Toulouges.[6]
Ultimately, the goal is to allow the connection Paris–Madrid in six hours by 2025, with stops in Nîmes, Montpellier, Béziers, Narbonne, Perpignan and Barcelona. The journey time would be less competitive with the plane on the complete route, but could be rather competitive on intermediate routes, such as Lyon–Madrid or Paris–Barcelona.
Progress
The French transport ministry approved the preliminary high-speed route and station locations in February 2016.[7] In autumn 2018, timescales were announced, namely 10 years to construct the Montpellier-Béziers section and another 10 years to construct the Béziers-Perpignan section.[8]
A memorandum of understanding for the financing of the line was signed on 22 January 2022, under which the Occitanie region and ten smaller-scale local authorities will pay 40% of the €2 billion cost. The national government contributes another 40% and the European Commission 20%. After this agreement a public inquiry process was about to start.[9] A special purpose body to oversee delivery, financing and project management was formed in March 2022.[10]
Permission to start the preliminary work on the first section was expected to be given by 27 July 2023. This first section runs for 52.3 km from Montpellier to Béziers. The expected start of construction was pushed back further, with construction on the first section to begin by early 2030 and this is now expected to be operational around 2034.[9] The construction of the second section would follow around 2039-2040 and be completed by 2044. For the second section a new public consultation is expected to begin in the fall of 2025.[11] The second section covers the remainder of the route and is 97.7 km long.[9]
The total cost of the project is estimated at 6 billion euros.[9][11]
References
- ^ Barrow, Keith. [1], Rail Journal, Wednesday 3 February 2016. Retrieved on 16 March 2017.
- ^ [2], LGV Montpellier-Perpignan project website, retrieved on 16 March 2017
- ^ [3], Line map covering Béziers, retrieved on 2019-03-01
- ^ [4], Project map covering the Narbonne area, retrieved 2019-03-01
- ^ [5], Project map showing connections to classic lines near Perpignan
- ^ [6], Future junction, retrieved on 2019-03-01
- ^ "Route approved for Montpellier - Perpignan HSL". International Railway Journal. 3 February 2016.
- ^ [7], Planned timescales, retrieved on 2019-03-01
- ^ a b c d "Funding agreement advances high speed link to Perpignan". Railway Gazette. 2 February 2022. Retrieved 4 February 2022.
- ^ Haydock, David (1 March 2023). "Montpellier - Perpignan HSL construction gets green light". International Railway Journal. Retrieved 9 January 2025.
- ^ a b Assemat, Anthony (2 April 2024). "La LGV Montpellier-Perpignan est lancée : les quatre choses à savoir sur le projet". www.entreprises-occitanie.com (in French). Retrieved 9 January 2025.