File:YnaresCenterjf5353 12.JPG
Size of this preview: 800 × 600 pixels. Other resolutions: 320 × 240 pixels | 640 × 480 pixels | 1,024 × 768 pixels | 1,280 × 960 pixels | 2,560 × 1,920 pixels | 4,608 × 3,456 pixels.
Original file (4,608 × 3,456 pixels, file size: 6.98 MB, MIME type: image/jpeg)
Summary
DescriptionYnaresCenterjf5353 12.JPG | English: Ynares Center[1] is an indoor sporting arena[2] located in Antipolo, Rizal, Philippines. The arena was built at a cost of P350 million. The coliseum was constructed in a 5-hectare lot located at the heart of the City of Antipolo. This is the current landmark in the province where PBA games and big concerts are held regularly. This is also the site of the 100th Foundation Anniversary Celebration of the province. It has also hosted international events, such as the FIBA Asia Champions Cup. It was the home court of the Pasig-Rizal Pirates of the Metropolitan Basketball Association in 2000.[3] - [4] Antipolo (officially: City of Antipolo, Filipino: Lungsod ng Antipolo) is a city in the Philippines located in the province of Rizal; about 25 kilometres (16 mi) east of Manila. It is the largest city in the CALABARZON Region. It is also the seventh most populous city in the country with a population of 633,971 in 2007. Antipolo local elections, 2013[5] --- This place is situated in Rizal, Region 4, Philippines, its geographical coordinates are 14° 35' 11" North, 121° 10' 31" East and its original name (with diacritics) is Antipolo. Fire hits Antipolo City library, Comelec field office May 24, 2013 Ynares proclaimed next Mayor of Antipolo City Governor Casimiro “Jun” Ynares III was proclaimed the next Mayor of Antipolo (Tagalog: Lalawigan ng Rizal), s a province located in the CALABARZON, just 16 kilometers east of Manila. Governor Dr. Casimiro Ynares III on June 17, 2008 announced the transfer of the Capitol from Pasig. Its P 270-million capitol building, constructed in Antipolo by Ortigas & Co., owner thereof, was completed by December. Built on 5-hectare lot at the Ynares Center, it employs 2,008 employees. The New Capitol was successfully inaugurated on March 4, 2009, bringing back the Capitol Building inside the provincial territory, from which it was absent for 33 years (when Pasig was incorporated into Metro Manila).Rizal capitol to be transferred to Antipolo June 17, 2008 AusAID grants P 68M for Rizal schools’ construction 1st of July 2013. |
Date | |
Source | Own work |
Author | Ramon FVelasquez |
Licensing
I, the copyright holder of this work, hereby publish it under the following license:
This file is licensed under the Creative Commons Attribution-Share Alike 3.0 Unported license.
- You are free:
- to share – to copy, distribute and transmit the work
- to remix – to adapt the work
- Under the following conditions:
- attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
Items portrayed in this file
depicts
creator
some value
Wikimedia username: Ramon FVelasquez
author name string: Ramon FVelasquez
copyright status
copyrighted
copyright license
Creative Commons Attribution-ShareAlike 3.0 Unported
inception
5 July 2013
captured with
Nikon Coolpix AW100
source of file
original creation by uploader
ISO speed
125
exposure time
0.0008 second
f-number
3.9
focal length
5 millimetre
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 15:41, 7 July 2013 | 4,608 × 3,456 (6.98 MB) | Ramon FVelasquez | User created page with UploadWizard |
File usage
The following page uses this file:
Global file usage
The following other wikis use this file:
Metadata
This file contains additional information, probably added from the digital camera or scanner used to create or digitize it.
If the file has been modified from its original state, some details may not fully reflect the modified file.
Camera manufacturer | NIKON |
---|---|
Camera model | COOLPIX AW100 |
Exposure time | 1/1,250 sec (0.0008) |
F-number | f/3.9 |
ISO speed rating | 125 |
Date and time of data generation | 14:18, 5 July 2013 |
Lens focal length | 5 mm |
Orientation | Normal |
Horizontal resolution | 300 dpi |
Vertical resolution | 300 dpi |
Software used | COOLPIX AW100V1.0 |
File change date and time | 14:18, 5 July 2013 |
Y and C positioning | Co-sited |
Exposure Program | Normal program |
Exif version | 2.3 |
Date and time of digitizing | 14:18, 5 July 2013 |
Meaning of each component |
|
Image compression mode | 4 |
Exposure bias | 0 |
Maximum land aperture | 3.9 APEX (f/3.86) |
Metering mode | Pattern |
Light source | Unknown |
Flash | Flash did not fire, auto mode |
Supported Flashpix version | 1 |
Color space | sRGB |
File source | Digital still camera |
Scene type | A directly photographed image |
Custom image processing | Normal process |
Exposure mode | Auto exposure |
White balance | Auto white balance |
Digital zoom ratio | 0 |
Focal length in 35 mm film | 28 mm |
Scene capture type | Standard |
Scene control | High gain down |
Contrast | Normal |
Saturation | Normal |
Sharpness | Normal |
Subject distance range | Distant view |
Reference for direction of image | Magnetic direction |
Direction of image | 310.06 |
GPS tag version | 0.0.3.2 |