Buxar Thermal Power Plant
Buxar Thermal Power Plnt | |
---|---|
Country | India |
Location | Buxar, Bihar |
Coordinates | 25°27′44″N 83°52′57″E / 25.4622°N 83.8826°E |
Status | Under construction |
Construction began | 2019 |
Construction cost | INR 10,500 Crores |
Owner | SJVN Thermal Private ltd |
Operator | SJVN |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Nameplate capacity | 1320 MW upcoming |
Buxar Thermal Power Plant is a coal-based thermal power plant located at Chausa village in Buxar district, Bihar, India. It was conceptualized in 2013 when SJVN signed an MoU with Bihar State Power Holding Company Limited (BSPHCL) and Bihar Infrastructure Company (BPIC).[1] Prime Minister Narendra Modi laid the foundation stone for this project in March 2019.[2] Larsen & Toubro Limited holds the contract for the construction, at an estimated cost of Rs 7,000 crores.[3] It is scheduled to open in 2023.[2]
Capacity
The planned capacity of the power plant will be 1320 MW (2x660 MW).
Stage | Unit Number | Capacity (MW) | Date of Commissioning | Status |
---|---|---|---|---|
1st | 1 | 660 | - | Under construction |
1st | 2 | 660 | - | Under construction |
See also
References
- ^ "SJVN | Project Details". sjvn.nic.in. Archived from the original on 25 June 2014.
- ^ a b Kumar, Madan (2019). "Bihar: Buxar thermal power plant to be ready by 2023". The Times of India. Archived from the original on 24 January 2020. Retrieved 1 January 2020.
- ^ Pillay, Amritha. "L&T wins more than Rs 7,000 crore order for building power plant in Bihar".
External links