Blackhillock Substation
Blackhillock Substation is an electrical substation located in the north east of Scotland, near the town of Keith in Moray.
It is owned and operated by Scottish Southern Electricity Network (SSEN). Covering an area the size of 24 football pitches, it is as of January 2019, the UK's largest[clarification needed] substation and Europe's second biggest.[1]
Construction began in early 2015 to upgrade the existing substation so it could accommodate the new 1,200 MW Caithness - Moray Link.[2] The £1bn construction project had four main elements: 400kV and 132kV gas-insulated substations, one 275kV air-insulated substation, a High Voltage Direct Current (HVDC) converter for the Caithness - Moray subsea link and a HVDC underground cable from the substation to Portgordon.[3] In January 2019 construction and commissioning were completed making it the UK's largest operating substation. It is seen as integral to the UK electricity grid as the north of Scotland generates much renewable energy via windfarms. The upgrade was primarily done to accommodate the Beatrice Windfarm.[1]
A 300 MW / 600 MWh grid battery started construction at the site in 2023.[4]
See also
References
- ^ a b Keane, Kevin (11 January 2019). "Major subsea electricity link completed". BBC News. Retrieved 11 January 2019.
- ^ "Work completed on £1bn subsea electricity cable". www.expressandstar.com. Retrieved 12 January 2019.
- ^ "Blackhillock substation". Blackhillock substation. Retrieved 12 January 2019.
- ^ "Zenobē begins construction of 300MW battery energy storage project in Scotland". Solar Power Portal. 22 February 2023.
57°31′23″N 2°56′53″W / 57.523°N 2.948°W