Eisspeedway

Lowari Tunnel

Lowari Tunnel
لواری سرنگ
Lowari Tunnel
Overview
LocationUpper Dir, Khyber Pakhtunkhwa, Pakistan
Coordinates35°21′0″N 71°48′0″E / 35.35000°N 71.80000°E / 35.35000; 71.80000
StatusFully Functional
Route Dir-Chitral Highway
CrossesLowari Pass
Operation
Work begunSeptember 2005 (2005-09)[1]
OpenedJuly 2017 (2017-07)[2]
Technical
LengthTunnel 1: 8.5 kilometres (5.3 mi)
Tunnel 2: 1.9 kilometres (1.2 mi)
No. of lanes2

Lowari Tunnel (Urdu: لواری سرنگ, Lowari Surang) consists of two separate tunnels, and the combined length of both tunnels is 10.4 kilometers (6.5 miles). It is a vehicular tunnel under the Lowari Pass of the Hindu Kush mountains, between Dir and Chitral in Khyber Pakhtunkhwa province of Pakistan. The tunnel effectively bypassed Pakistan's reliance on Afghanistan to reach Chitral region. It is operated by the National Highway Authority and carries traffic on the N-45 National Highway, thus bypassing Lowari Pass. Construction was partly completed by June 2017,[3][4][5][6] By late 2018, the tunnel was open to vehicular traffic for at least ten hours per day.[7]

The total cost of the tunnel was Rs. 26.954 billion (US$93 million).[8] The tunnel is one of the longest tunnels in South Asia, and is the longest in Pakistan, superseding the 3.91 km (2.43 mi) Khojak Tunnel in 2018.

History

Originally conceived as a railway tunnel, construction began in September 1975 and was inaugurated by Prime Minister Zulfiqar Ali Bhutto. However, less than a year later work stopped in 1976 due to non allocation of funds.[9]

Construction resumed in September 2005 by Pervez Musharraf Govt, and the tunnel was initially expected to be completed by 2009; with conversion into a vehicle road tunnel.[9] This is one of the mega highway projects initiated in 2005 during the government of Pervez Musharraf. But work was stopped at times due to a shortage of funds, and at others due to a change in design and security reasons.

Work on the new plan started in 2013 and the project was completed in 2017.

Benefit

  • The tunnel essentially allows traffic on the N45 National Highway to bypass the Lowari Pass and reduces the 14 hour drive between Chitral and Peshawar to only 7 hours.[citation needed]
  • The tunnel also facilitates all-weather transportation, as during the long winter season the Lowari Pass is closed, and travelers to and from Chitral used to travel into Kunar, Afghanistan and then back into Pakistan to access the rest of the country.[citation needed]
  • Lower tunnel has effectively bypassed Pakistan's reliance on Afghanistan to access Chitral region.
  • The tunnel is facilitating economic development in the Chitral district, as of late 2018.[7]

References

  1. ^ "Lowari Tunnel likely to be completed by 2017". The Nation. Retrieved 20 July 2017.
  2. ^ Mian, Bakhtawar. "Sharif to inaugurate Lowari tunnel today". Dawn. Retrieved 20 July 2017.
  3. ^ "Lowari Main Tunnel". downloads.nha.gov.pk. Retrieved 24 May 2017.
  4. ^ "Lowari Tunnel to be operational by June". www.thenews.com.pk. Retrieved 24 May 2017.
  5. ^ "Lowari Tunnel Northern Portal Access Road". downloads.nha.gov.pk. Retrieved 24 May 2017.
  6. ^ "Lowari Tunnel Southern Portal Access Road". downloads.nha.gov.pk. Retrieved 24 May 2017.
  7. ^ a b Zahiruddin (30 September 2018). "Lowari tunnel: opportunities and challenges". Dawn. Retrieved 26 November 2019.
  8. ^ "Lowari Tunnel Project to be completed next month at cost of Rs26bn". geo.tv.
  9. ^ a b Staff (16 April 2015). "Lowari Tunnel project to be completed by Oct, 2017". Pakistan Ki Awaz. Archived from the original on 26 May 2015.

https://www.chitraltoday.net/2020/02/09/lowari-tunnel-a-blessing-for-chitral/

https://www.chitraltoday.net/2017/06/lowari-tunnel-ready-for-opening-at-last/

https://www.chitraltoday.net/2015/01/pm-orders-yearly-increase-of-rs-6-billion-for-lowari-tunnel/