Guandi Dam
Guandi Dam | |
---|---|
Location | Sichuan Province |
Coordinates | 27°49′17″N 101°53′10″E / 27.82139°N 101.88611°E |
Status | Operational |
Construction began | 2010 |
Opening date | 2012 |
Owner(s) | Ertan Hydropower Development Company |
Dam and spillways | |
Type of dam | Gravity, roller-compacted concrete |
Impounds | Yalong River |
Height | 168 metres (551 ft) |
Elevation at crest | 1,334 metres (4,377 ft) |
Reservoir | |
Creates | Guandi Reservoir |
Total capacity | 760,000,000 cubic metres (616,142 acre⋅ft) |
Normal elevation | 1,330 metres (4,364 ft) |
Power Station | |
Commission date | 2012-2013 |
Turbines | 4 x 600 MW |
Installed capacity | 2,400 MW |
The Guandi Dam (simplified Chinese: 官地大坝; traditional Chinese: 官地大壩; pinyin: Guāndì Dàbà) is a gravity dam on the Yalong River, a tributary of the Yangtze River in Sichuan Province Southwest of China. It supplies water to four hydroelectric generators, each with generating capacity of 600 MW. The total generating capacity of the project is 2,400 MW. Construction started on October 20, 2010, with a ground-breaking ceremony.[1][2] On February 9, 2012, the dam began to impound the reservoir and the last of the four generators were commissioned on 28 March 2013.[3][4]
See also
References
- ^ "Guandi and Tongzilin hydropower stations at Yalong River start construction". State Development and Investment Corps. October 20, 2010. Retrieved 8 January 2011.
- ^ "Guandi Hydroelectric Project". Ertan Hydropower Development Company. Archived from the original on 11 January 2011. Retrieved 8 January 2011.
- ^ "Hydropower construction Parade Crown land. Yalong River Hydropower Station ConstructionHydropower construction Parade Crown land. Yalong River Hydropower Station Construction" (in Chinese). Power Foo. Retrieved 17 March 2012.
- ^ "Hydropower Station all four generating units put into operation" (in Chinese). State Power Information Network. Archived from the original on 26 May 2013. Retrieved 1 May 2013.