G7201 Nanning Ring Expressway
Nanning Ring Expressway | ||||
---|---|---|---|---|
南宁绕城高速公路 | ||||
南宁绕城高速 | ||||
Route information | ||||
Length | 82 km (51 mi) | |||
Existed | 2003–present | |||
Location | ||||
Country | China | |||
Highway system | ||||
|
The Nanning Ring Expressway (Chinese: 南宁绕城高速公路), designated as G7201, is a ring expressway in Nanning, Guangxi, China. The Nanning Ring Expressway is composed of 3 sections, with a total length of 82 kilometers. The whole expressway was opened to traffic on 28 December 2003.[1]
History
Construction of southeastern section started in 1996 and was completed and opened to traffic on 8 December 1998. This section is a two-way six-lane expressway with a design speed of 120 km/h.[2]
The western section is a two-way four-lane expressway with a design speed of 100 km/h. Construction started in 2001 and was completed and opened to traffic in December 2003.[3]
Construction of the northeastern section started in 2001 and was completed and opened to traffic in December 2003. This section is a two-way four-lane expressway with a design speed of 100 km/h.[4]
References
- ^ "总投资19.46亿元 南宁环城高速公路全线建成贯通". 中国工程机械商贸网. 2003-12-29. Archived from the original on 2020-04-28.
- ^ "南宁至北海高速公路南宁至那马段". 广西高速公路管理局. 2011-09-21. Archived from the original on 2016-03-05.
- ^ "南宁至坛洛高速公路". 广西高速公路管理局. 2011-09-21. Archived from the original on 2016-03-04.
- ^ "河池水任至南宁高速公路都安至南宁段". 广西高速公路管理局. 2011-09-21. Archived from the original on 2016-03-05.