Cindere Dam
Dam in Turkey
Cindere Dam | |
---|---|
Location | Turkey |
Construction began | 1994 |
Opening date | 2007 |
Dam and spillways | |
Height | 78 m (256 ft) |
Reservoir | |
Total capacity | 82,000,000 m3 (66,478 acre⋅ft) |
Power Station | |
Installed capacity | 29 MW |
Annual generation | 88 GWh |
Cindere Dam is a gravity dam on the Büyük Menderes River in Denizli Province, Turkey. The development was backed by the Turkish State Hydraulic Works.[1]
See also
External links
- DSI, State Hydraulic Works (Turkey), Retrieved December 16, 2009
References
- ^ "Cindere Dam and HEPP | Özaltın Holding - Ankara - Türkiye". www.ozaltin.com.tr. Retrieved 2024-04-08.
Nuclear | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Renewable energy |
| ||||||||||
Fossil |
| ||||||||||
Power stations projected or under construction in italics |
38°06′56″N 29°02′06″E / 38.1155°N 29.0351°E / 38.1155; 29.0351